Home Projects More like: Physiological systems integration in the optimisation of exercise tolerance [Clear] # Title Funder Funding Start End Status 21 Glutamate-Energetics In Schizophrenia And Treatment Resistance MRC £6,295,480 Sept. 30, 2023 Sept. 30, 2027 Active 22 Control of uterine Ca by membrane potential: role of the T-type calcium channels. BBSRC £658,546 Dec. 1, 2006 Nov. 30, 2009 Closed 23 Control of uterine Ca by membrane potential: role of the T-type calcium channels. BBSRC £1,646,365 Dec. 1, 2006 Nov. 30, 2009 Closed 24 Co-benefits of energy networks integration technologies for system operation EPSRC, NERC £0 Sept. 30, 2018 March 31, 2023 Closed 25 Challenging Lock-in through Urban Energy Systems (CLUES) EPSRC £1,582,390 Sept. 30, 2010 Dec. 31, 2012 Closed 26 Challenging Lock-in through Urban Energy Systems (CLUES) EPSRC £3,955,975 Sept. 30, 2010 Dec. 31, 2012 Closed 27 Understanding biomass value chains and the environment-food-energy-water nexus in Malaysia through whole-systems analysis and optimisation (BEFEW) EPSRC £394,850 May 14, 2017 Oct. 31, 2019 Closed 28 Collecting New Time Use Resources (CNTUR) ESRC £7,637,420 Jan. 1, 2014 March 31, 2019 Closed 29 Collecting New Time Use Resources (CNTUR) ESRC £375,592 March 31, 2019 March 31, 2020 Closed 30 Collecting New Time Use Resources (CNTUR) ESRC £19,093,550 Jan. 1, 2014 March 31, 2019 Closed 31 Collecting New Time Use Resources (CNTUR) ESRC £938,980 March 31, 2019 April 1, 2020 Closed 32 Dissecting populations of PrRP neurone in conditional transgenic mice BBSRC £838,768 May 3, 2010 May 2, 2013 Closed 33 Dissecting populations of PrRP neurone in conditional transgenic mice BBSRC £2,096,920 May 3, 2010 May 3, 2013 Closed 34 Community-scale Energy Demand Reduction in India (CEDRI) EPSRC £1,186,704 Nov. 1, 2017 March 30, 2022 Closed 35 Community-scale Energy Demand Reduction in India (CEDRI) Newton Fund £2,966,760 Nov. 1, 2017 March 31, 2022 Closed 36 Design rules for defect-tolerant photovoltaics EPSRC £757,154 June 6, 2021 June 5, 2024 Active 37 Design rules for defect-tolerant photovoltaics EPSRC £1,892,885 June 6, 2021 June 6, 2024 Active 38 Elucidating early stage ALS pathomecanisms that drive mitochondrial dysfunction MRC £1,701,162 Jan. 1, 2020 May 6, 2023 Active 39 Elucidating early stage ALS pathomecanisms that drive mitochondrial dysfunction MRC £4,252,905 Jan. 1, 2020 May 7, 2023 Closed 40 Energy efficient lower limb prostheses EPSRC £1,343,634 Sept. 1, 2013 March 10, 2017 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 »