# Title Funder Funding Start End Status
21 Graphene Aerogel for Super Lightweight High-Performance Polymer Electrolyte Fuel Cells EPSRC
£429,410
Nov. 18, 2019 Nov. 17, 2022 Active
22 Graphene Aerogel for Super Lightweight High-Performance Polymer Electrolyte Fuel Cells EPSRC
£1,073,525
Nov. 18, 2019 Nov. 17, 2022 Closed
23 Metal-Organic Frameworks based membranes for gas separation in Li-air batteries EPSRC
£0
Sept. 30, 2020 Sept. 30, 2024 Active
24 Newton Fund-Integrating water cooled concentrated photovoltaics with waste heat reuse EPSRC
£145,034
Jan. 1, 2015 March 30, 2017 Closed
25 Newton Fund-Integrating water cooled concentrated photovoltaics with waste heat reuse Newton Fund
£362,585
Jan. 1, 2015 March 31, 2017 Closed
26 ENVIRO-COAT: ENVIROnmentally assisted, engineered Corrosion prOducts for Aqueous corrosion miTigation EPSRC
£1,733,840
March 31, 2020 March 31, 2023 Closed
27 Softer Frustrated Lewis Pair Catalysis for Harder Substrates: Stannyl Cations for the Hydrogenation of Carbon Dioxide to Methanol and Methyl Formate EPSRC
£197,442
July 27, 2016 Aug. 27, 2017 Closed
28 Softer Frustrated Lewis Pair Catalysis for Harder Substrates: Stannyl Cations for the Hydrogenation of Carbon Dioxide to Methanol and Methyl Formate EPSRC
£493,605
July 27, 2016 Aug. 28, 2017 Closed
29 Charging ahead with Multi-layer Ceramic Capacitor materials EPSRC
£199,604
June 30, 2017 Sept. 29, 2018 Closed
30 Charging ahead with Multi-layer Ceramic Capacitor materials EPSRC
£499,010
June 30, 2017 Sept. 30, 2018 Closed
31 Process Intensification for Acceleration of Bio & Chemo Catalysis in Biorefining BBSRC
£14,392
Feb. 14, 2011 Feb. 13, 2012 Closed
32 Process Intensification for Acceleration of Bio & Chemo Catalysis in Biorefining BBSRC
£35,980
Feb. 14, 2011 Feb. 13, 2012 Closed
33 Study of chemical interactions at the early stage of aviation fuel surface deposition using ab initio density functional theory EPSRC
£0
Jan. 4, 2022 Jan. 3, 2026 Active
34 Physiological systems integration in the optimisation of exercise tolerance BBSRC
£97,284
Sept. 30, 2011 Feb. 28, 2014 Closed
35 Physiological systems integration in the optimisation of exercise tolerance BBSRC
£425,066
Aug. 31, 2011 Feb. 28, 2014 Closed
36 Physiological systems integration in the optimisation of exercise tolerance BBSRC
£243,210
Sept. 30, 2011 Feb. 28, 2014 Closed
37 Physiological systems integration in the optimisation of exercise tolerance BBSRC
£1,062,665
Aug. 31, 2011 Feb. 28, 2014 Closed
38 Addressing Livestock-derived Antimicrobial pollution in the Nairobi River in Kenya EPSRC
£272,262
May 31, 2020 May 30, 2021 Closed
39 Addressing Livestock-derived Antimicrobial pollution in the Nairobi River in Kenya GCRF
£680,655
May 31, 2020 May 31, 2021 Closed
40 Photocatalytic covalent organic frameworks for hydrogen production and storage EPSRC
£0
Sept. 30, 2019 Sept. 30, 2023 Closed
Reset