Home Projects More like: Can you get more with less? Organic Photovoltaics for longer lifetime and lower cost via blending with commodity polymers [Clear] # Title Funder Funding Start End Status 21 Graphene Aerogel for Super Lightweight High-Performance Polymer Electrolyte Fuel Cells EPSRC £429,410 Nov. 18, 2019 Nov. 17, 2022 Active 22 Graphene Aerogel for Super Lightweight High-Performance Polymer Electrolyte Fuel Cells EPSRC £1,073,525 Nov. 18, 2019 Nov. 17, 2022 Closed 23 Metal-Organic Frameworks based membranes for gas separation in Li-air batteries EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 24 Newton Fund-Integrating water cooled concentrated photovoltaics with waste heat reuse EPSRC £145,034 Jan. 1, 2015 March 30, 2017 Closed 25 Newton Fund-Integrating water cooled concentrated photovoltaics with waste heat reuse Newton Fund £362,585 Jan. 1, 2015 March 31, 2017 Closed 26 ENVIRO-COAT: ENVIROnmentally assisted, engineered Corrosion prOducts for Aqueous corrosion miTigation EPSRC £1,733,840 March 31, 2020 March 31, 2023 Closed 27 Softer Frustrated Lewis Pair Catalysis for Harder Substrates: Stannyl Cations for the Hydrogenation of Carbon Dioxide to Methanol and Methyl Formate EPSRC £197,442 July 27, 2016 Aug. 27, 2017 Closed 28 Softer Frustrated Lewis Pair Catalysis for Harder Substrates: Stannyl Cations for the Hydrogenation of Carbon Dioxide to Methanol and Methyl Formate EPSRC £493,605 July 27, 2016 Aug. 28, 2017 Closed 29 Charging ahead with Multi-layer Ceramic Capacitor materials EPSRC £199,604 June 30, 2017 Sept. 29, 2018 Closed 30 Charging ahead with Multi-layer Ceramic Capacitor materials EPSRC £499,010 June 30, 2017 Sept. 30, 2018 Closed 31 Process Intensification for Acceleration of Bio & Chemo Catalysis in Biorefining BBSRC £14,392 Feb. 14, 2011 Feb. 13, 2012 Closed 32 Process Intensification for Acceleration of Bio & Chemo Catalysis in Biorefining BBSRC £35,980 Feb. 14, 2011 Feb. 13, 2012 Closed 33 Study of chemical interactions at the early stage of aviation fuel surface deposition using ab initio density functional theory EPSRC £0 Jan. 4, 2022 Jan. 3, 2026 Active 34 Physiological systems integration in the optimisation of exercise tolerance BBSRC £97,284 Sept. 30, 2011 Feb. 28, 2014 Closed 35 Physiological systems integration in the optimisation of exercise tolerance BBSRC £425,066 Aug. 31, 2011 Feb. 28, 2014 Closed 36 Physiological systems integration in the optimisation of exercise tolerance BBSRC £243,210 Sept. 30, 2011 Feb. 28, 2014 Closed 37 Physiological systems integration in the optimisation of exercise tolerance BBSRC £1,062,665 Aug. 31, 2011 Feb. 28, 2014 Closed 38 Addressing Livestock-derived Antimicrobial pollution in the Nairobi River in Kenya EPSRC £272,262 May 31, 2020 May 30, 2021 Closed 39 Addressing Livestock-derived Antimicrobial pollution in the Nairobi River in Kenya GCRF £680,655 May 31, 2020 May 31, 2021 Closed 40 Photocatalytic covalent organic frameworks for hydrogen production and storage EPSRC £0 Sept. 30, 2019 Sept. 30, 2023 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 »