# Title Funder Funding Start End Status
41 Quantifying Ridge Flank Hydrothermal Alteration on the Juan de Fuca Ridge: IODP Expedition 327 NERC
£87,560
June 3, 2013 Dec. 3, 2013 Closed
42 A fully coupled XFEM model for hydraulic fracturing in multi-phase porous media NERC
£0
Sept. 30, 2017 Sept. 29, 2021 Closed
43 A fully coupled XFEM model for hydraulic fracturing in multi-phase porous media NERC
£0
Sept. 30, 2017 Sept. 30, 2021 Closed
44 Indiacool - UK-India Solar Cooling Innovation (Energy Catalyst Mid-stage Programme) EPSRC
£200,118
March 6, 2017 July 4, 2018 Closed
45 Indiacool - UK-India Solar Cooling Innovation (Energy Catalyst Mid-stage Programme) EPSRC
£500,295
March 6, 2017 July 5, 2018 Closed
46 Imaging the fine-scale velocity structure, the physical properties and the sedimentary faulting that controls the fluid flow within the gas-charged se NERC
£0
Sept. 25, 2019 March 29, 2023 Active
47 Dielectric properties of aqueous fluids at depth NERC
£3,017,545
Nov. 1, 2020 Dec. 1, 2024 Active
48 SCOTWOHR - INDUSTRIAL WASTE HEAT RECOVERY USING SUPERCRITICAL CARBON DIOXIDE CYCLES EPSRC
£1,415,850
Jan. 1, 2021 Dec. 31, 2023 Active
49 Industrial waste heat recovery using supercritical carbon dioxide cycles (SCOTWOHR) EPSRC
£1,535,718
Jan. 1, 2021 Dec. 31, 2023 Active
50 Industrial waste heat recovery using supercritical carbon dioxide cycles (SCOTWOHR) EPSRC
£3,839,295
Jan. 1, 2021 Dec. 31, 2024 Active
51 Micro Leidenfrost Heat Engine EPSRC
£0
Aug. 31, 2020 Feb. 29, 2024 Active
52 Geothermal Power Generated from UK Granites (GWatt) NERC
£1,249,368
Jan. 2, 2019 June 30, 2023 Active
53 Geothermal Power Generated from UK Granites (GWatt) NERC
£1,039,216
Jan. 2, 2019 June 30, 2023 Active
54 Geothermal Power Generated from UK Granites (GWatt) NERC
£2,598,040
Jan. 2, 2019 July 1, 2023 Closed
55 Geothermal Power Generated from UK Granites (GWatt) NERC
£3,123,420
Jan. 2, 2019 July 1, 2023 Closed
56 Geothermal Power Generated from UK Granites (GWatt) NERC
£1,302,924
Jan. 2, 2019 June 30, 2023 Active
57 Geothermal Power Generated from UK Granites (GWatt) NERC
£2,172,706
Jan. 2, 2019 July 1, 2023 Closed
58 IODP Phase 1 post cruise support for C Smith-Duque Expedition 344 NERC
£69,440
March 1, 2014 Aug. 30, 2014 Closed
59 IODP Phase 1 post cruise support for C Smith-Duque Expedition 344 NERC
£173,600
March 1, 2014 Aug. 31, 2014 Closed
60 Quantum Biology to Enhance CO2 Fixation EPSRC
£0
Sept. 30, 2019 July 30, 2021 Closed
Reset