Home Projects More like: BRIM: Building Resilience Into risk Management [Clear] # Title Funder Funding Start End Status 1 Disaster management and resilience in electric power systems EPSRC £482,152 Feb. 1, 2016 April 29, 2018 Closed 2 Engineering Complexity Resilience Network Plus EPSRC £1,004,694 Feb. 15, 2016 Feb. 14, 2019 Closed 3 Engineering Complexity Resilience Network Plus EPSRC £2,511,735 Feb. 15, 2016 Feb. 14, 2019 Closed 4 RV-DSS: An industry-friendly resilience-based interdependency assessment tool - case study North Argyll NERC £125,686 Nov. 1, 2017 April 29, 2018 Closed 5 RV-DSS: An industry-friendly resilience-based interdependency assessment tool - case study North Argyll NERC £314,215 Nov. 1, 2017 April 30, 2018 Closed 6 Socio-ecological resilience to soil erosion driven by extreme climatic events: past, present and future challenges in East Africa. NERC £337,278 Nov. 1, 2016 Oct. 31, 2017 Closed 7 Socio-ecological resilience to soil erosion driven by extreme climatic events: past, present and future challenges in East Africa. NERC £843,195 Nov. 1, 2016 Oct. 31, 2017 Closed 8 i-BUILD: Infrastructure BUsiness models, valuation and Innovation for Local Delivery EPSRC £7,135,722 July 31, 2013 March 30, 2018 Closed 9 i-BUILD: Infrastructure BUsiness models, valuation and Innovation for Local Delivery EPSRC £17,839,305 July 31, 2013 March 31, 2018 Closed 10 Partnerships for Resilience through Innovation and Integrated Management of Emergencies and Disasters (PRIMED) EPSRC £302,694 Sept. 30, 2019 March 30, 2022 Active 11 Evaluating the resilience of critical infrastructure for emergency response to extreme flood events in Leicester City NERC £130,526 Oct. 27, 2014 Dec. 31, 2015 Closed 12 Evaluating the resilience of critical infrastructure for emergency response to extreme flood events in Leicester City NERC £326,315 Oct. 27, 2014 Dec. 31, 2015 Closed 13 Resilience and Robustness of Dynamic Manufacturing Supply Networks EPSRC £4,744,410 Aug. 31, 2013 Feb. 28, 2017 Closed 14 Enhancing system resilience and organisational safety in the nuclear industry through joined-up regulation, policy and procedures EPSRC £0 Sept. 30, 2020 Sept. 30, 2027 Active 15 Between a rock and a wet place: exploring historical trajectories of exposure, governance and tenure to build resilience to multiple hazards in SIDS NERC £321,556 Nov. 1, 2016 Feb. 2, 2018 Closed 16 Between a rock and a wet place: exploring historical trajectories of exposure, governance and tenure to build resilience to multiple hazards in SIDS NERC £803,890 Nov. 1, 2016 Feb. 2, 2018 Closed 17 Low Carbon Transitions of Fleet Operations in Metropolitan Sites (LC TRANSFORMS) EPSRC £1,610,344 Dec. 1, 2015 Nov. 30, 2019 Closed 18 Low Carbon Transitions of Fleet Operations in Metropolitan Sites (LC TRANSFORMS) EPSRC £4,025,860 Dec. 1, 2015 Nov. 30, 2019 Closed 19 The systemic city: Infrastructure interdependency and complex value business models EPSRC £532,982 June 30, 2016 June 29, 2019 Closed 20 The systemic city: Infrastructure interdependency and complex value business models EPSRC £1,332,455 June 30, 2016 June 30, 2019 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »