Home Projects More like: Modelling the human occupancy factor in the design of naturally ventilated buildings [Clear] # Title Funder Funding Start End Status 81 Two-Stage Low-Temperature Hydrogen Combustion EPSRC, NERC £0 Sept. 30, 2018 Dec. 31, 2023 Active 82 Q-PLUS Intelligent Building energy management system utilising energy storage Innovate UK £586,032 March 1, 2018 July 30, 2019 Closed 83 Q-PLUS Intelligent Building energy management system utilising energy storage Innovate UK £1,465,080 March 1, 2018 July 31, 2019 Closed 84 Final Development of a Zero Energy Dehumidification and Cooling System EPSRC £414,170 March 31, 2017 March 31, 2019 Closed 85 Pool Innovation Centre (A) and Tremough Innovation Centre (B) Innovate UK £153,906 Aug. 31, 2011 Sept. 29, 2014 Closed 86 Unsteady wind effects on natural ventilation EPSRC £406,135 April 30, 2007 April 30, 2010 Closed 87 Advanced Climate Technology Urban Atmospheric Laboratory (ACTUAL) EPSRC £2,046,374 March 1, 2009 Sept. 29, 2014 Closed 88 Advanced Climate Technology Urban Atmospheric Laboratory (ACTUAL) EPSRC £5,115,935 March 1, 2009 Sept. 30, 2014 Closed 89 Towards net-zero carbon buildings: tackling uncertainty when predicting the carbon footprint of construction products and whole buildings EPSRC £688,802 Aug. 15, 2021 Feb. 15, 2024 Active 90 Quantum Magnetometry Facility EPSRC £4,008,944 Feb. 1, 2022 Jan. 31, 2026 Active 91 EPSRC and SFI Centre for Doctoral Training in Energy Resilience and the Built Environment EPSRC £11,473,301 Sept. 30, 2019 March 30, 2028 Active 92 EPSRC and SFI Centre for Doctoral Training in Energy Resilience and the Built Environment EPSRC £29,281,480 Sept. 30, 2019 March 31, 2028 Active 93 "Interface Engineering for Maximizing the Efficiency of Halide Perovskite Indoor Photovoltaics" EPSRC £0 Aug. 31, 2021 Feb. 28, 2025 Active 94 The HIVE - Resource costs EPSRC £235,398 Aug. 4, 2013 Aug. 3, 2016 Closed 95 ENLIL Wind Turbine- Alternator and Charge Controller Innovate UK £49,413 Nov. 1, 2022 April 29, 2023 Active 96 Gas Turbine Internal Air System Sealing Design EPSRC £0 Sept. 23, 2018 Sept. 29, 2022 Active 97 SIMS-ID: Smart Indoor Monitoring System-Integration and Deployment Innovate UK £41,790 Jan. 1, 2022 March 30, 2022 Closed 98 Solar cooling of buildings using low emissivity transpired solar collectors and desiccant air conditioning technology Innovate UK £33,746 March 31, 2015 Sept. 29, 2015 Closed 99 Solar cooling of buildings using low emissivity transpired solar collectors and desiccant air conditioning technology Innovate UK £84,365 March 31, 2015 Sept. 30, 2015 Closed 100 COincident Probabilistic climate change weather data for a Sustainable built Environment (COPSE) EPSRC £169,580 Aug. 25, 2008 Aug. 24, 2011 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »