Home Projects More like: Advanced chemistry and corrosion studies under hot water conditions relevant to LWR coolant [Clear] # Title Funder Funding Start End Status 41 Thermal Hydraulics for Boiling and Passive Systems EPSRC £3,985,730 March 18, 2013 Dec. 17, 2015 Closed 42 Linking Microstructure to Neutron Irradiation Defects in Advanced Manufacture of Steels EPSRC £3,325,150 Dec. 1, 2016 Nov. 30, 2020 Closed 43 Intermetallic Dispersion Strengthened 'IDS-Steels' for Generation IV Nuclear EPSRC £628,950 June 30, 2022 June 29, 2025 Active 44 Intermetallic Dispersion Strengthened 'IDS-Steels' for Generation IV Nuclear EPSRC £3,144,750 June 30, 2022 June 30, 2025 Active 45 Thermal transient effects in fusion front wall/breeder blanket components EPSRC £0 Sept. 30, 2022 Sept. 29, 2026 Active 46 Thermal transient effects in fusion front wall/breeder blanket components EPSRC £0 Sept. 30, 2022 Sept. 30, 2026 Active 47 Multiscale investigation of corrosion deposition in high temperature high pressure water for nuclear power plants EPSRC £0 Sept. 30, 2022 Sept. 30, 2026 Active 48 Probing surface-molecule interactions of perovskite catalysts EPSRC £26,872 April 30, 2014 June 29, 2015 Closed 49 Probing surface-molecule interactions of perovskite catalysts EPSRC £67,180 April 30, 2014 June 30, 2015 Closed 50 A molten salt community framework for predictive modelling of critical characteristics EPSRC £2,955,910 June 30, 2023 June 30, 2026 Active 51 Atom probe tomography and microscale mechanical testing of neutron irradiated Sizewell B reactor pressure vessel steel EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 52 Optimising Plasma Sprayed Tungsten Coatings EPSRC, NERC £0 Sept. 30, 2018 March 31, 2023 Closed 53 NANODOT+: NANOmaterials for the radiometric Detection Of Tritium - PLacement with USers NERC £273,670 Nov. 1, 2017 Oct. 31, 2018 Closed 54 RADIATION RESISTANT HIGH ENTROPY ALLOYS FOR FAST REACTOR CLADDING APPLICATIONS EPSRC £2,184,665 Jan. 1, 2018 June 30, 2021 Closed 55 Simultaneous Corrosion/Irradiation Testing in Lead and Lead-Bismuth Eutectic: The Radiation Decelerated Corrosion Hypothesis (RC-3) EPSRC £1,086,628 Jan. 1, 2020 Dec. 31, 2023 Active 56 Simultaneous Corrosion/Irradiation Testing in Lead and Lead-Bismuth Eutectic: The Radiation Decelerated Corrosion Hypothesis (RC-3) EPSRC £2,716,570 Jan. 1, 2020 Sept. 30, 2024 Active 57 Ceramic Coatings for Clad (The C^3 Project): Advanced Accident-Tolerant Ceramic Coatings for Zr-alloy Cladding EPSRC £5,375,720 June 23, 2013 Sept. 14, 2015 Closed 58 Ceramic Coatings for Clad (The C^3 Project): Advanced Accident-Tolerant Ceramic Coatings for Zr-alloy Cladding EPSRC £1,744,120 Dec. 15, 2015 Sept. 1, 2017 Closed 59 From Processing to Simulated In-Reactor Performance of Zr Cladding. EPSRC £982,574 March 17, 2016 March 16, 2020 Closed 60 From Processing to Simulated In-Reactor Performance of Zr Cladding. EPSRC £48,958 June 30, 2016 June 29, 2020 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »