Home Projects More like: BIogeochemical Gradients and RADionuclide transport. BIGRAD [Clear] # Title Funder Funding Start End Status 61 Performance Assessment and Development of Mineral-Based Cements at High Pressure and Temperature for Deep Borehole Disposal of HLW and SNF EPSRC £2,123,520 Nov. 4, 2013 April 3, 2017 Closed 62 An Electrochemical Approach to Study Carbonation of Novel Lime Based Materials EPSRC £249,904 Nov. 1, 2010 Feb. 21, 2014 Closed 63 An Electrochemical Approach to Study Carbonation of Novel Lime Based Materials EPSRC £276,912 Oct. 14, 2010 Jan. 31, 2014 Closed 64 FilterEx – A sustainable solution for aluminium smelting filter dust wastes Innovate UK £278,211 Sept. 30, 2022 March 31, 2024 Active 65 Environmental behaviour and management of U-containing fuel debris particles EPSRC £1,305,475 Oct. 31, 2018 Sept. 30, 2021 Closed 66 MBase: The Molecular Basis of Advanced Nuclear Fuel Separations EPSRC £3,418,265 March 31, 2010 Sept. 30, 2013 Closed 67 Advancing Location Accuracy via Collimated Nuclear Assay for Decommissioning Robotic Applications (ALACANDRA) EPSRC £3,405,625 April 7, 2021 April 7, 2025 Active 68 Next generation anion-exchange membranes (AEM) with covalently-bound antiradical functions for enhanced durability EPSRC £1,063,676 Sept. 23, 2020 March 23, 2024 Active 69 Next generation anion-exchange membranes (AEM) with covalently-bound antiradical functions for enhanced durability EPSRC £900,380 Sept. 30, 2020 March 31, 2024 Active 70 Resource Recovery and Remediation of Alkaline Wastes NERC £1,549,764 Aug. 30, 2014 March 31, 2019 Closed 71 Resource recovery and remediation of alkaline wastes NERC £626,358 Aug. 30, 2014 Feb. 28, 2018 Closed 72 Resource Recovery and Remediation of Alkaline Wastes NERC £3,874,410 Aug. 30, 2014 March 31, 2019 Closed 73 Resource recovery and remediation of alkaline wastes NERC £1,565,895 Aug. 30, 2014 Feb. 28, 2018 Closed 74 Engineered UK clays for production of low-carbon cements EPSRC £165,356 June 30, 2022 June 29, 2026 Active 75 Engineered UK clays for production of low-carbon cements EPSRC £997,934 June 30, 2022 June 29, 2026 Active 76 Engineered UK clays for production of low-carbon cements EPSRC £857,130 June 30, 2022 June 29, 2026 Active 77 AMS-UK: A UK Accelerator Mass Spectrometry Facility for Nuclear Fission Research EPSRC £13,952,600 Nov. 1, 2019 Nov. 30, 2023 Active 78 Temperature and Alkali Stable Polymer Electrolytes for Hydrogen and Carbon Dioxide Alkaline Electrolysers EPSRC £706,292 Dec. 8, 2014 Dec. 7, 2017 Closed 79 Temperature and Alkali Stable Polymer Electrolytes for Hydrogen and Carbon Dioxide Alkaline Electrolysers EPSRC £602,472 Dec. 31, 2014 June 29, 2018 Closed 80 Laser induced breakdown spectroscopy tandem with laser ablation NERC £297,678 Sept. 30, 2019 July 29, 2020 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »