Home Projects More like: Development of Refractory Coatings to support the Decarbonisation of the Steelmaking Process [Clear] # Title Funder Funding Start End Status 1 Development of Refractory Coatings to support the Decarbonisation of the Steelmaking Process EPSRC £0 Sept. 30, 2022 Sept. 29, 2026 Active 2 Continuous Measurement of Liquid Steel Temperature and Chemistry EPSRC £0 Jan. 1, 2022 Dec. 31, 2025 Active 3 Continuous Measurement of Liquid Steel Temperature and Chemistry EPSRC £0 Jan. 1, 2022 Dec. 31, 2025 Active 4 New Generation Low Carbon Refractory Composites Based on Graphite-Exfoliation EPSRC £1,234,866 Aug. 31, 2012 Feb. 29, 2016 Closed 5 Uncovering Fundamental Mechanisms to Enable Sustainable Steel Manufacturing EPSRC £2,320,158 March 31, 2016 March 30, 2022 Closed 6 H2-Heat: Thermal energy transport for heating and cooling with innovative hydrogen(H2) technologies EPSRC £1,990,480 Jan. 1, 2021 Dec. 31, 2023 Active 7 H2-Heat: Thermal energy transport for heating and cooling with innovative hydrogen(H2) technologies EPSRC £4,976,200 Jan. 1, 2021 Dec. 31, 2024 Active 8 Engineering sustainable routes to carbon capture and reusage: Conversion of CO2 from steelworks to coating products. EPSRC £0 Sept. 30, 2019 Dec. 30, 2023 Active 9 Engineering sustainable routes to carbon capture and reusage: Conversion of CO2 from steelworks to coating products. EPSRC £0 Sept. 30, 2019 Dec. 30, 2023 Active 10 EPSRC Centre for Doctoral Training in Carbon Capture and Storage and Cleaner Fossil Energy EPSRC £7,051,488 March 31, 2014 Sept. 13, 2024 Active 11 EPSRC Centre for Doctoral Training in Carbon Capture and Storage and Cleaner Fossil Energy EPSRC £17,639,430 March 31, 2014 Sept. 14, 2024 Active 12 Defect-engineered metal-organic frameworks for carbon dioxide capture EPSRC £194,084 April 30, 2018 Jan. 31, 2020 Closed 13 Defect-engineered metal-organic frameworks for carbon dioxide capture EPSRC £485,210 April 30, 2018 Jan. 31, 2020 Closed 14 Evaluation of a large energy intensive site to detemine if centralised electricity generation and steam distribution is preferable to local generation EPSRC £1,279,344 Sept. 30, 2009 March 31, 2013 Closed 15 Evaluation of a large energy intensive site to detemine if centralised electricity generation and steam distribution is preferable to local generation EPSRC £3,198,360 Sept. 30, 2009 March 31, 2013 Closed 16 ASSURE - Advanced Steel Shaping Using Reduced Energy EPSRC £383,726 Jan. 1, 2015 Oct. 31, 2016 Closed 17 ASSURE - Advanced Steel Shaping Using Reduced Energy EPSRC £959,315 Jan. 1, 2015 Oct. 31, 2016 Closed 18 Decarbonising Steel: Carbon Capture of Blast Furnace Gas through Chemical Absorption EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 19 IMPULSE - Advanced Industrial Manufacture of Next-Generation MARBN Steel for Cleaner Fossil Plant EPSRC £171,634 Feb. 1, 2016 Jan. 31, 2019 Closed 20 Deployment of ultrasonic melt flow enhancement technology to achieve energy savings of 27% across the energy intensive, injection moulded consumer packaging sector Innovate UK £5,542,770 March 1, 2022 Feb. 29, 2024 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 »