Home Projects More like: ELEVATE (ELEctrochemical Vehicle Advanced TEchnology) [Clear] # Title Funder Funding Start End Status 1 ELEVATE (ELEctrochemical Vehicle Advanced TEchnology) EPSRC £6,532,732 Jan. 13, 2015 July 11, 2019 Closed 2 Realising Structural Power: Addressing the Manufacturing Challenges EPSRC £2,523,255 May 31, 2023 May 31, 2026 Active 3 Developing FUTURE Vehicles (Fundamental Understanding of Technologies for Ultra Reduced Emission Vehicles) EPSRC £6,024,056 Dec. 1, 2011 May 30, 2016 Closed 4 Developing FUTURE Vehicles (Fundamental Understanding of Technologies for Ultra Reduced Emission Vehicles) UKRI £15,060,140 Dec. 1, 2011 May 31, 2016 Closed 5 Prediction of the performance of structural power composites EPSRC £0 Sept. 30, 2017 March 30, 2022 Active 6 Digital Circular Electrochemical Economy (DCEE) EPSRC £4,823,100 Aug. 31, 2021 Aug. 31, 2024 Active 7 Beyond structural; multifunctional composites that store electrical energy EPSRC £546,728 Feb. 1, 2017 Sept. 30, 2021 Closed 8 Beyond structural; multifunctional composites that store electrical energy EPSRC £1,672,812 Feb. 1, 2017 July 30, 2021 Closed 9 Beyond structural; multifunctional composites that store electrical energy EPSRC £4,182,030 Feb. 1, 2017 July 31, 2021 Closed 10 Engineered Textile Blade with Actively controlled surface/profile EPSRC £142,054 Sept. 30, 2016 March 30, 2018 Closed 11 Engineered Textile Blade with Actively controlled surface/profile EPSRC £355,135 Sept. 30, 2016 March 31, 2018 Closed 12 Structural Analysis and Optimisation of a Wave Energy Converter EPSRC £0 Aug. 31, 2019 Sept. 14, 2023 Closed 13 Battery/Supercapacitor Hybrids for Transport Energy Storage EPSRC £757,660 July 31, 2011 July 30, 2013 Closed 14 Battery/Supercapacitor Hybrids for Transport Energy Storage EPSRC £1,894,150 July 31, 2011 July 31, 2013 Closed 15 Supergen Energy Networks hub 2018 EPSRC £7,541,722 June 30, 2020 Sept. 29, 2023 Active 16 Supergen Energy Networks hub 2018 EPSRC £10,367,170 Sept. 30, 2018 June 29, 2020 Closed 17 Supergen Energy Networks hub 2018 EPSRC £25,917,925 Sept. 30, 2018 June 30, 2020 Closed 18 Supergen Energy Networks hub 2018 EPSRC £18,854,305 June 30, 2020 Sept. 30, 2023 Closed 19 NanocompEIM Phase 2 - Nanocomposite Advanced Electrical Insulation Systems for Enhanced HVAC and HVDC Energy Networks EPSRC £751,414 Sept. 30, 2016 Dec. 31, 2019 Closed 20 NanocompEIM Phase 2 - Nanocomposite Advanced Electrical Insulation Systems for Enhanced HVAC and HVDC Energy Networks EPSRC £1,878,535 Sept. 30, 2016 Dec. 31, 2019 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 »