Home Projects More like: Sensors in Extreme Environments [Clear] # Title Funder Funding Start End Status 81 Multi-Sensory 3D Imaging System for Domestic Properties (SISD) Innovate UK £49,000 June 30, 2015 Dec. 31, 2015 Closed 82 Multi-Sensory 3D Imaging System for Domestic Properties (SISD) Innovate UK £122,500 June 30, 2015 Dec. 31, 2015 Closed 83 Robotic systems for retrieval of contaminated material from hazardous zones EPSRC £2,783,120 March 31, 2015 March 31, 2018 Closed 84 Systematically characterising the exotic material properties of weakly collisional plasmas FLF £5,088,870 Sept. 25, 2022 Sept. 25, 2026 Active 85 Adapting a casting winch for a non-stop wave propelled USV ISCF £215,970 Feb. 1, 2023 July 31, 2023 Closed 86 UK Carbon Capture and Storage Research Centre 2017 (UKCCSRC 2017) EPSRC £12,467,518 March 31, 2017 Dec. 31, 2022 Active 87 UK Carbon Capture and Storage Research Centre 2017 (UKCCSRC 2017) EPSRC £31,168,795 March 31, 2017 Dec. 31, 2022 Closed 88 Biomimetic quantum-dot nanodonuts for membrane voltage imaging BBSRC £181,438 Nov. 1, 2022 Oct. 31, 2023 Active 89 Novel Distributed Sensors Network Integrated With IOT For Industrial Asset Integrity Monitoring Innovate UK £151,662 March 31, 2018 March 31, 2019 Closed 90 Novel Distributed Sensors Network Integrated With IOT For Industrial Asset Integrity Monitoring Innovate UK £379,155 March 31, 2018 March 31, 2019 Closed 91 Flexible and stretchable force sensor for static and dynamic measurements (FlexFo) EPSRC £201,928 Dec. 1, 2017 Feb. 28, 2019 Closed 92 In Situ Turbulence Replication Evaluation And Measurement Innovate UK £312,354 Aug. 31, 2015 Nov. 30, 2017 Closed 93 'DAISEE' from 3-Sci Ltd' : A DecadeAutonomy, Integral Sensor, Easy-fit, Extreme distance communication network. Innovate UK £50,002 April 30, 2016 Jan. 31, 2017 Closed 94 'DAISEE' from 3-Sci Ltd' : A DecadeAutonomy, Integral Sensor, Easy-fit, Extreme distance communication network. Innovate UK £125,005 April 30, 2016 Jan. 31, 2017 Closed 95 Performance of structural and fuel materials in molten lead-based fluids EPSRC £0 Sept. 19, 2021 Sept. 29, 2025 Active 96 Performance of structural and fuel materials in molten lead-based fluids EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 97 Wide-Area Instrumentation of Power Networks using Existing Infrastructure EPSRC £826,760 June 30, 2016 June 29, 2019 Closed 98 Wide-Area Instrumentation of Power Networks using Existing Infrastructure EPSRC £2,066,900 June 30, 2016 June 30, 2019 Closed 99 Reduction of Energy Demand in Buildings through Optimal Use of Wireless Behaviour Information (Wi-be) Systems EPSRC £1,195,256 Sept. 30, 2010 Aug. 30, 2012 Closed 100 Reduction of Energy Demand in Buildings through Optimal Use of Wireless Behaviour Information (Wi-be) Systems EPSRC £308,852 Aug. 31, 2012 Sept. 29, 2013 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »