Home Projects More like: Gas Flow/Market Analysis [Clear] # Title Funder Funding Start End Status 61 Turbo-Discharging: Reducing CO2 Emissions from Current and Future Vehicles EPSRC £242,062 July 4, 2010 Jan. 4, 2012 Closed 62 Optimization of Thermally Driven Building Cooling Systems EPSRC £0 Sept. 30, 2019 Sept. 29, 2023 Active 63 Optimization of Thermally Driven Building Cooling Systems EPSRC £0 Sept. 30, 2019 Dec. 31, 2023 Closed 64 Test Engines to Accelerate Net Zero Shipping and Power Generation (TITANZ) EPSRC £17,429,765 Sept. 30, 2023 Sept. 30, 2025 Active 65 Adaptive Cylinder Pressure Reconstruction for Production Engines EPSRC £1,645,485 July 1, 2007 Jan. 1, 2011 Closed 66 Decarbonising Auxiliary Load in Freight Today Innovate UK £378,514 Sept. 30, 2022 Sept. 29, 2023 Active 67 Zero Emission Rail Freight Power Innovate UK £800,000 June 30, 2020 March 30, 2021 Closed 68 Zero Emission Rail Freight Power Innovate UK £2,000,000 June 30, 2020 March 31, 2021 Closed 69 Molecular Network Heat Engines UKRI £2,309,054 Jan. 1, 2020 Dec. 31, 2023 Active 70 Molecular Network Heat Engines FLF £5,772,635 Jan. 1, 2020 Dec. 31, 2023 Active 71 FLF renewal FLF £2,965,010 Jan. 1, 2024 Dec. 31, 2026 Active 72 Can pipeline integrity become 'greener' through more effective chemical use Innovate UK £40,438 Jan. 1, 2022 March 30, 2022 Closed 73 Can pipeline integrity become 'greener' through more effective chemical use Innovate UK £101,095 Jan. 1, 2022 March 31, 2022 Closed 74 ACE Diesel Innovate UK £49,740 Sept. 30, 2012 June 29, 2013 Closed 75 Simultaneous Corrosion/Irradiation Testing in Lead and Lead-Bismuth Eutectic: The Radiation Decelerated Corrosion Hypothesis (RC-3) EPSRC £1,086,628 Jan. 1, 2020 Dec. 31, 2023 Active 76 Simultaneous Corrosion/Irradiation Testing in Lead and Lead-Bismuth Eutectic: The Radiation Decelerated Corrosion Hypothesis (RC-3) EPSRC £2,716,570 Jan. 1, 2020 Sept. 30, 2024 Active 77 PTFE Coating Wear of Air Foil Bearings for Fuel Cell Applications Innovate UK £20,982 Oct. 2, 2022 April 2, 2023 Active 78 Variable compression ratio range extender optimised for heavy duty vehicles with renewable fuels Innovate UK £5,118,674 March 1, 2021 March 30, 2022 Closed 79 Up-Featured Trailers for Future Logistics Innovate UK £367,190 June 30, 2018 Dec. 31, 2019 Closed 80 Composite structural housing with integrated thermal management EPSRC £0 Sept. 19, 2021 Sept. 29, 2025 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »