Home Projects More like: Increasing Energy Efficiency and Decarbonising Swimming Pools Using Non-Chemical, Advanced Physical Water Treatment Technology [Clear] # Title Funder Funding Start End Status 1 Increasing Energy Efficiency and Decarbonising Swimming Pools Using Non-Chemical, Advanced Physical Water Treatment Technology Innovate UK £262,450 Sept. 30, 2020 Sept. 29, 2021 Closed 2 Optimisation of Microbial Electrolysis Cells Through Computational Modelling EPSRC £0 Sept. 30, 2018 Oct. 29, 2022 Active 3 Optimisation of Microbial Electrolysis Cells Through Computational Modelling EPSRC £0 Sept. 30, 2018 Oct. 30, 2022 Closed 4 Understanding Cement-Superplasticiser Interactions in Geopolymer Encapsulants for Safe Disposal of Radioactive Waste EPSRC £0 Sept. 25, 2022 Sept. 24, 2026 Active 5 Engineering the household removal of micropollutants from wastewater EPSRC £524,362 Dec. 19, 2014 April 29, 2018 Closed 6 Engineering the household removal of micropollutants from wastewater EPSRC £1,310,905 Dec. 19, 2014 April 30, 2018 Closed 7 Delivering Low Carbon Anaerobic Wastewater Treatment and Renewable Energy Production EPSRC £398,214 March 31, 2008 Sept. 29, 2009 Closed 8 Delivering Low Carbon Anaerobic Wastewater Treatment and Renewable Energy Production EPSRC £995,535 March 31, 2008 Sept. 30, 2009 Closed 9 Robotics for Nuclear Decommissioning EPSRC £0 Jan. 25, 2017 Dec. 31, 2020 Closed 10 SPECIFIC Tranche 2: Heat, Water, PV and Bio-inspiration EPSRC £8,134,890 May 31, 2013 May 31, 2016 Closed 11 Thermal monitoring instrumentation for metal additive manufacturing - PYRAM EPSRC £961,862 Oct. 2, 2022 Oct. 1, 2025 Active 12 Non-Thermal Plasma for Chemical-Free Water Treatment EPSRC £390,958 March 30, 2015 May 30, 2017 Closed 13 Harris brick safety system Innovate UK £46,578 Nov. 1, 2022 April 29, 2023 Active 14 Linking ecosystem services and businesses through Green Bonds NERC £53,500 Nov. 1, 2017 July 30, 2018 Closed 15 Linking ecosystem services and businesses through Green Bonds NERC £133,750 Nov. 1, 2017 July 31, 2018 Closed 16 Graphene Enhanced Concrete for a Resilient Recovery Innovate UK £757,242 March 31, 2021 March 30, 2022 Closed 17 Remote Monitoring and Control of Electromethanogenic Reactors - Circular Waste to Energy Innovate UK £199,998 Nov. 1, 2020 April 29, 2021 Closed 18 Southern Ocean carbon indices and metrics (SARDINE) NERC £589,936 Jan. 1, 2020 Aug. 30, 2023 Active 19 Southern Ocean carbon indices and metrics (SARDINE) NERC £88,746 Feb. 1, 2020 Jan. 31, 2023 Active 20 Next Generation Integrated Cloud Hosting Environment (NICHE) Innovate UK £745,701 Nov. 1, 2011 Jan. 31, 2013 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »