Home Projects More like: The establishment of load driven real-time energy utility tariffing for smart grid control of household appliances [Clear] # Title Funder Funding Start End Status 81 Feasibility of a wetting layer absorption carbon capture process based on chemical solvents EPSRC £3,321,240 Jan. 21, 2013 April 10, 2016 Closed 82 : Unlocking the value chain of two-wheeler electric vehicles in Indian cities (the “Project”) Innovate UK £500,000 July 31, 2021 March 31, 2022 Closed 83 Integrated wind-wave control of semi-submersible floating offshore wind turbine platforms (FOWT-Control) EPSRC £1,535,870 June 30, 2023 June 30, 2026 Active 84 Integrated wind-wave control of semi-submersible floating offshore wind turbine platforms (FOWT-Control) EPSRC £2,183,495 June 29, 2023 June 29, 2026 Active 85 Integrated wind-wave control of semi-submersible floating offshore wind turbine platforms (FOWT-Control) EPSRC £1,955,075 June 30, 2023 June 30, 2026 Active 86 Mechanisms and Synthesis of Materials for Next-Generation Lithium Batteries Using Flame Spray Pyrolysis EPSRC £4,004,905 April 30, 2020 April 30, 2024 Active 87 Increasing the share of renewable energy in future electric power grids through improved voltage control EPSRC £0 Jan. 1, 2023 June 30, 2026 Active 88 High efficiency reversible solid oxide cells for the integration of offshore renewable energy using hydrogen EPSRC £1,384,435 Jan. 10, 2022 Jan. 9, 2025 Active 89 High efficiency reversible solid oxide cells for the integration of offshore renewable energy using hydrogen EPSRC £1,447,085 Jan. 10, 2022 Jan. 9, 2025 Active 90 High efficiency reversible solid oxide cells for the integration of offshore renewable energy using hydrogen EPSRC £1,441,520 March 31, 2022 March 31, 2025 Active 91 Reducing Risk through Uncertainty Quantification for Past, Present and Future Generations of Nuclear Power Plant EPSRC £1,026,930 March 1, 2018 Feb. 28, 2021 Closed 92 Reducing risk through uncertainty quantification for past, present and future generations of nuclear power plants EPSRC £1,285,580 March 1, 2018 Feb. 28, 2021 Closed 93 System-level Co-design and Control of Large Capacity Wave Energy Converters with Multiple PTOs EPSRC £666,595 Aug. 31, 2021 Aug. 31, 2024 Active 94 System-level Co-design and Control of Large Capacity Wave Energy Converters with Multiple PTOs EPSRC £1,728,535 Oct. 3, 2021 Oct. 3, 2024 Active 95 C-AWARE: Enabling Consumer Awareness of Carbon Footprint Through Mobile Service Innovation (Cambridge/Nottingham/Exeter) EPSRC £183,900 June 30, 2010 Aug. 31, 2011 Closed 96 C-AWARE: Enabling Consumer Awareness of Carbon Footprint Through Mobile Service Innovation (Cambridge/Nottingham/Exeter) EPSRC £62,465 Aug. 31, 2011 June 30, 2012 Closed 97 C-AWARE: Enabling Consumer Awareness of Carbon Footprint Through Mobile Service Innovation (Cambridge/Nottingham/Exeter) EPSRC £613,945 July 31, 2010 July 31, 2012 Closed 98 Development of Unified Experimental and Theoretical Approach to Predict Reactive Transport in Subsurface Porous Media EPSRC £1,890,410 March 31, 2014 Sept. 30, 2017 Closed 99 Going Nuclear? Exploring the multi-level politics of including nuclear energy in a low carbon future ESRC £28,184 Oct. 31, 2011 Dec. 31, 2013 Closed 100 Compact, laser-based gas analyser for remote, long-term process control of solid oxide fuel cells Innovate UK £50,000 April 30, 2011 July 30, 2011 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »