Home Projects More like: Turbo Green Burner [Clear] # Title Funder Funding Start End Status 81 Low-Cost Redox Flow Electrolyte - LoCoLyte Innovate UK £389,040 March 31, 2020 April 29, 2021 Closed 82 Low-Cost Redox Flow Electrolyte - LoCoLyte Innovate UK £972,600 March 31, 2020 April 30, 2021 Closed 83 Hydrogen Infrastructure Uncertainty Management for Heat Decarbonisation EPSRC £3,166,520 March 31, 2021 March 30, 2025 Active 84 Hydrogen Infrastructure Uncertainty Management for Heat Decarbonisation EPSRC £7,916,300 March 31, 2021 March 31, 2025 Active 85 Solar Photovoltaic Systems Integration EPSRC £0 Nov. 1, 2020 April 29, 2024 Active 86 Solar Photovoltaic Systems Integration EPSRC £0 Nov. 1, 2020 April 30, 2024 Active 87 Sustainable Zero-Carbon Solar Heating, Cooling and Power in Urban and Off-Grid Environments NERC £0 Sept. 30, 2020 May 8, 2024 Active 88 Sustainable Zero-Carbon Solar Heating, Cooling and Power in Urban and Off-Grid Environments NERC £0 Sept. 30, 2020 Dec. 31, 2024 Active 89 INTEGRATE: Integrating seasoNal Thermal storagE with multiple enerGy souRces to decArbonise Thermal Energy EPSRC £2,891,664 Sept. 30, 2020 Sept. 29, 2024 Active 90 INTEGRATE: Integrating seasoNal Thermal storagE with multiple enerGy souRces to decArbonise Thermal Energy EPSRC £7,229,160 Sept. 30, 2020 Sept. 30, 2024 Active 91 The nature of inequality: Assessing the impact of green development initiatives in developed countries ESRC, NERC £0 Sept. 30, 2017 Jan. 31, 2022 Closed 92 Investigation of Technologies for Fault Level Management in Future Distribution Networks EPSRC, NERC £0 Sept. 30, 2017 Feb. 28, 2022 Closed 93 hot Gas Raman Identification and measurement For Foundation INdustries (GRIFFIN) Innovate UK £1,114,624 March 31, 2021 June 29, 2022 Active 94 Essays in environmental economics: assessing externalities from distributed infrastructure EPSRC £0 Sept. 30, 2016 March 30, 2021 Closed 95 Essays in environmental economics: assessing externalities from distributed infrastructure EPSRC £0 Sept. 30, 2016 March 31, 2021 Closed 96 Inverter connected battery technology with advanced fault ride through capability on LV grid system to help offset the need for standby generation EPSRC £196,306 Oct. 4, 2010 Jan. 4, 2013 Closed 97 Inverter connected battery technology with advanced fault ride through capability on LV grid system to help offset the need for standby generation EPSRC £490,765 Oct. 4, 2010 Jan. 4, 2013 Closed 98 Enhanced Frequency Response from a Liquid Air Energy Storage (LAES) plant Innovate UK £3,738,866 June 30, 2017 June 29, 2018 Closed 99 Enhanced Frequency Response from a Liquid Air Energy Storage (LAES) plant Innovate UK £100,000 Nov. 1, 2016 Jan. 31, 2017 Closed 100 Ultra-Efficient Isothermal Rotary Vane Compressor-Motor Innovate UK £10,000 Feb. 1, 2015 July 30, 2015 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »