# Title Funder Funding Start End Status
81 CO2 injection and storage - Short and long-term behaviour at different spatial scales EPSRC
£2,424,408
Nov. 1, 2013 Aug. 30, 2017 Closed
82 CO2 injection and storage - Short and long-term behaviour at different spatial scales EPSRC
£6,061,020
Nov. 1, 2013 Aug. 31, 2017 Closed
83 TGA/FTIR as a Core Equipment for Delivering Research on Energy System Compound Stability EPSRC
£199,806
Feb. 12, 2020 Aug. 10, 2021 Closed
84 TGA/FTIR as a Core Equipment for Delivering Research on Energy System Compound Stability EPSRC
£499,515
Feb. 12, 2020 Aug. 11, 2021 Closed
85 Sustainable Urban Carbon Capture: Engineering Soils for Climate Change (SUCCESS) EPSRC
£3,796,800
May 31, 2014 Sept. 30, 2017 Closed
86 Novel adsorbents applied to integrated energy-efficient industrial CO2 capture EPSRC
£4,927,310
June 30, 2016 Jan. 31, 2020 Closed
87 The reduction of carbon dioxide by enzymes adsorbed on electrodes: from mechanistic studies to bioinspired catalysts BBSRC
£479,166
Oct. 21, 2012 Oct. 20, 2015 Closed
88 The Reduction of Carbon Dioxide by Enzymes Adsorbed on Electrodes: from Mechanistic Studies to Bioinspired Catalysts BBSRC
£620,246
Nov. 26, 2012 March 30, 2016 Closed
89 A Coordinated, Comprehensive approach to Carbon Capture and Utilisation EPSRC
£9,119,946
Sept. 6, 2012 Sept. 5, 2017 Closed
90 CO2 Post-Combustion Capture Using Amine Impregnated Synthetic Zeolites EPSRC
£960,510
Jan. 1, 2014 Dec. 31, 2016 Closed
Reset