# Title Funder Funding Start End Status
61 Optimising regional clusters of smart local energy systems EPSRC
£147,695
April 30, 2015 April 30, 2016 Closed
62 Governing the Climate Adaptation of Care Settings NERC
£1,516,702
April 30, 2020 Sept. 29, 2023 Active
63 SYNAPS (Synchronous Analysis and Protection System) EPSRC
£398,590
Nov. 1, 2015 Jan. 31, 2018 Closed
64 SYNAPS (Synchronous Analysis and Protection System) EPSRC
£996,475
Nov. 1, 2015 Jan. 31, 2018 Closed
65 Mathematical foundations for energy networks: buffering, storage and transmission EPSRC
£975,812
Jan. 23, 2011 Sept. 29, 2015 Closed
66 Mathematical foundations for energy networks: buffering, storage and transmission EPSRC
£2,439,530
Jan. 23, 2011 Sept. 30, 2015 Closed
67 Financial risk and the impact of climate change NERC
£452,000
Feb. 1, 2019 Dec. 31, 2020 Closed
68 Maximising the Carbon Impact of Wind Power EPSRC
£471,480
Nov. 1, 2015 April 29, 2018 Closed
69 Maximising the Carbon Impact of Wind Power EPSRC
£1,178,700
Nov. 1, 2015 April 30, 2018 Closed
70 Multi Vector Energy Distribution System Modelling and Optimisation with Integrated Demand Side Response EPSRC
£483,202
Aug. 31, 2014 Aug. 30, 2017 Closed
71 Multi Vector Energy Distribution System Modelling and Optimisation with Integrated Demand Side Response EPSRC
£1,208,005
Aug. 31, 2014 Aug. 31, 2017 Closed
72 Combination Hazard of Extreme rainfall, storm Surge & high Tide on estuarine infrastructure (CHEST) NERC
£527,740
Nov. 14, 2017 Sept. 13, 2018 Closed
73 Integrated Development of Low-Carbon Energy Systems (IDLES): A Whole-System Paradigm for Creating a National Strategy EPSRC
£14,095,328
Nov. 1, 2018 Oct. 31, 2023 Active
74 Integrated Development of Low-Carbon Energy Systems (IDLES): A Whole-System Paradigm for Creating a National Strategy EPSRC
£35,238,320
Nov. 1, 2018 April 30, 2024 Active
75 Co-creating visions and pathways for integrated urban heat systems EPSRC
£1,917,738
July 29, 2018 March 30, 2026 Active
76 Co-creating visions and pathways for integrated urban heat systems EPSRC
£4,794,345
July 29, 2018 March 31, 2026 Active
77 Multi-objective performance-based design of tall buildings using energy harvesting enabled tuned mass-damper-inerter (TMDI) devices EPSRC
£1,253,690
Jan. 1, 2015 Sept. 30, 2017 Closed
78 Adaptation and Resilience In Energy Systems (ARIES) EPSRC
£1,543,414
Nov. 1, 2011 Oct. 31, 2015 Closed
79 Adaptation and Resilience In Energy Systems (ARIES) EPSRC
£3,858,535
Nov. 1, 2011 Oct. 31, 2015 Closed
80 Increasing Resilience to Environmental Hazards in Border Conflict Zone NERC
£853,970
Jan. 9, 2017 Oct. 8, 2017 Closed
Reset