Home Projects More like: Oscillatory baffled reactor for enhanced 1C gas bioconversion for energy production and storage [Clear] # Title Funder Funding Start End Status 1 Oscillatory baffled reactor for enhanced 1C gas bioconversion for energy production and storage BBSRC £196,818 Jan. 1, 2016 Dec. 31, 2016 Closed 2 Oscillatory baffled reactor for enhanced 1C gas bioconversion for energy production and storage BBSRC £492,045 Jan. 1, 2016 Dec. 31, 2016 Closed 3 Integrated biological approaches for high-grade biomethane vehicle fuel production from food waste BBSRC £812,778 June 30, 2022 June 29, 2025 Active 4 Integrated biological approaches for high-grade biomethane vehicle fuel production from food waste BBSRC £2,031,945 June 30, 2022 June 30, 2025 Active 5 Catalytic conversion of CO2 and biomass-derived phenols to high-value chemicals EPSRC £0 Sept. 30, 2021 Sept. 29, 2024 Active 6 Main Group Element Based Catalysis for Photolytic HX-Splitting EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 7 Main Group Element Based Catalysis for Photolytic HX-Splitting EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 8 Metabolic engineering of Cupriavidus necator H16 for the production of high value chemicals BBSRC £0 Sept. 30, 2015 Sept. 29, 2019 Closed 9 Softer Frustrated Lewis Pair Catalysis for Harder Substrates: Stannyl Cations for the Hydrogenation of Carbon Dioxide to Methanol and Methyl Formate EPSRC £197,442 July 27, 2016 Aug. 27, 2017 Closed 10 Softer Frustrated Lewis Pair Catalysis for Harder Substrates: Stannyl Cations for the Hydrogenation of Carbon Dioxide to Methanol and Methyl Formate EPSRC £493,605 July 27, 2016 Aug. 28, 2017 Closed 11 Engineering synthetic pathways to bio-ethylene production in Cupriavidus necator BBSRC £0 Sept. 30, 2016 March 25, 2021 Closed 12 17-ERACoBioTech: Sustainable production of added value chemicals from SynGas-derived methanol through Systems and Synthetic Biology approaches BBSRC £853,042 April 30, 2018 Dec. 31, 2021 Closed 13 Towards Zero Carbon Emissions: Novel Low Pressure Molecular Natural Gas/CO2/H2 Storage and Separation using Semi-Clathrates EPSRC £824,642 Jan. 15, 2008 Feb. 14, 2011 Closed 14 Development of a hydrogen and carbon dioxide flow meter Innovate UK £331,288 Sept. 30, 2020 July 30, 2021 Closed 15 Novel alkaline electrolyser with optimized micro-patterned electrodes for efficient ultra-low cost hydrogen Innovate UK £249,905 May 31, 2023 Nov. 30, 2023 Active 16 NWaste2H2- H2 Production by Reforming Bio-methane with Nitrogen Rich Waste Streams EPSRC £404,980 Sept. 17, 2017 Nov. 17, 2019 Closed 17 Novel Rechargeable Hybrid Redox Flow Battery Based on Particle-Stabilised Emulsions and H2 carriers EPSRC £258,789 Aug. 31, 2022 Aug. 30, 2024 Active 18 Novel Rechargeable Hybrid Redox Flow Battery Based on Particle-Stabilised Emulsions and H2 carriers EPSRC £1,293,945 Aug. 31, 2022 Aug. 31, 2024 Active 19 Bio-inspired (Fe,Ni)S nano-catalysts for CO2 conversion EPSRC £2,277,754 April 30, 2010 Oct. 30, 2013 Closed 20 Bio-inspired (Fe,Ni)S nano-catalysts for CO2 conversion EPSRC £5,694,385 April 30, 2010 Oct. 30, 2013 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »