# Title Funder Funding Start End Status
1 New microporous polymers for carbon dioxide selective membranes EPSRC
£772,782
March 1, 2013 Dec. 31, 2013 Closed
2 New microporous polymers for carbon dioxide selective membranes EPSRC
£1,440,450
Jan. 1, 2014 Feb. 29, 2016 Closed
3 High Permeance Membranes for Rapid-Response Retro-fit Carbon Capture EPSRC
£1,010,420
July 31, 2017 July 31, 2019 Closed
4 Composite membranes for H2 purification EPSRC
£0
Sept. 30, 2022 Sept. 29, 2026 Active
5 Graphene-based membranes EPSRC
£5,678,700
June 30, 2013 June 29, 2018 Closed
6 Metal-Organic Frameworks based membranes for gas separation in Li-air batteries EPSRC
£0
Sept. 30, 2020 Sept. 29, 2024 Active
7 Metal-Organic Frameworks based membranes for gas separation in Li-air batteries EPSRC
£0
Sept. 30, 2020 Sept. 30, 2024 Active
8 Molecular Cage Membranes for PX Separation EPSRC
£0
Sept. 30, 2019 Sept. 30, 2023 Closed
9 Novel polymers of intrinsic microporosity for heterogeneous base-catalysed reactions (HBC-PIMs) EPSRC
£561,060
Sept. 30, 2019 Sept. 29, 2023 Active
10 Novel polymers of intrinsic microporosity for heterogeneous base-catalysed reactions (HBC-PIMs) EPSRC
£1,402,650
Sept. 30, 2019 Sept. 30, 2023 Closed
11 Magnetic metal-organic framework composites for pollutant gas capture EPSRC
£0
Sept. 30, 2019 Sept. 30, 2023 Closed
12 Synthesis and NMR Studies of Electron and Proton Conducting Mesoporous Nb, Ta and Ti Oxide Composites for Alternative Energy Applications EPSRC
£605,688
June 30, 2011 March 1, 2015 Closed
13 Temperature and Alkali Stable Polymer Electrolytes for Hydrogen and Carbon Dioxide Alkaline Electrolysers EPSRC
£602,472
Dec. 31, 2014 June 29, 2018 Closed
14 Isothermal Refining by Organic Solvent Nanofiltration - ISOREF EPSRC
£1,473,325
Feb. 1, 2015 Jan. 31, 2017 Closed
15 Bio-methane production from urban organic matter BBSRC
£631,906
April 3, 2015 Oct. 31, 2018 Closed
16 Bio-methane production from urban organic matter BBSRC
£1,579,765
April 3, 2015 Oct. 31, 2018 Closed
17 Carbamide Power Systems - Urea Fuel Cells for Low Cost Energy EPSRC
£142,066
July 31, 2011 June 29, 2012 Closed
18 Carbamide Power Systems - Urea Fuel Cells for Low Cost Energy EPSRC
£261,090
May 6, 2010 Sept. 30, 2010 Closed
19 Carbamide Power Systems - Urea Fuel Cells for Low Cost Energy EPSRC
£355,165
July 31, 2011 June 30, 2012 Closed
20 Carbamide Power Systems - Urea Fuel Cells for Low Cost Energy EPSRC
£652,725
May 6, 2010 Oct. 1, 2010 Closed
Reset