Home Projects More like: Heriot-Watt University And Historic Scotland [Clear] # Title Funder Funding Start End Status 21 Design Toolbox for Energy Efficiency in the Process Industry EPSRC £970,108 Sept. 30, 2009 Sept. 29, 2013 Closed 22 Design Toolbox for Energy Efficiency in the Process Industry EPSRC £2,425,270 Sept. 30, 2009 Sept. 30, 2013 Closed 23 H2: Absolute zero-carbon propulsion systems EPSRC £860,306 March 1, 2022 Feb. 28, 2025 Active 24 H2: Absolute zero-carbon propulsion systems EPSRC £2,150,765 Aug. 31, 2022 Feb. 28, 2025 Active 25 Governance of energy and transport infrastructures and services for wellbeing and planetary boundaries EPSRC £0 Sept. 30, 2022 March 30, 2026 Active 26 Superconducting Ferromagnetic Metamaterials Enabling the Development of Resilient High Voltage / High Current Transmission Systems EPSRC £0 Sept. 27, 2020 March 31, 2024 Active 27 Superconducting Ferromagnetic Metamaterials Enabling the Development of Resilient High Voltage / High Current Transmission Systems EPSRC £0 Sept. 30, 2020 March 31, 2024 Active 28 Interface and Network Infrastructure to Support EV Participation in Smart Grids EPSRC £1,881,776 June 30, 2013 May 30, 2017 Closed 29 Interface and Network Infrastructure to Support EV Participation in Smart Grids EPSRC £4,704,440 June 30, 2013 May 31, 2017 Closed 30 GCRF_NF55 Fast-track vaccine cold-chain assessment and design for mass scale COVID-19 vaccination in Bangladesh (VaCoBD) EPSRC £1,059,186 Aug. 13, 2020 April 29, 2022 Closed 31 GCRF_NF55 Fast-track vaccine cold-chain assessment and design for mass scale COVID-19 vaccination in Bangladesh (VaCoBD) GCRF £2,647,965 Aug. 13, 2020 March 31, 2022 Closed 32 DESIGNING GOLD CATALYSTS FOR THE UTILISATION OF BIO-RENEWABLE FEEDSTOCKS EPSRC £666,034 Sept. 30, 2007 Sept. 29, 2010 Closed 33 DESIGNING GOLD CATALYSTS FOR THE UTILISATION OF BIO-RENEWABLE FEEDSTOCKS EPSRC £232,038 Sept. 30, 2007 Sept. 29, 2010 Closed 34 DESIGNING GOLD CATALYSTS FOR THE UTILISATION OF BIO-RENEWABLE FEEDSTOCKS EPSRC £580,095 Sept. 30, 2007 Sept. 30, 2010 Closed 35 DESIGNING GOLD CATALYSTS FOR THE UTILISATION OF BIO-RENEWABLE FEEDSTOCKS EPSRC £1,665,085 Sept. 30, 2007 Sept. 30, 2010 Closed 36 New Imaging Systems for Advanced Non-Destructive Evaluation EPSRC £5,053,240 Aug. 31, 2009 Aug. 31, 2013 Closed 37 Xylan arabinosyl transferases: identification and characterisation of their role in determining properties of grass cell walls BBSRC £1,295,788 April 14, 2013 Feb. 28, 2018 Closed 38 Identification of xylan arabinosyl transferases and their role in determining xylan structural and cross-linking properties within grass cell walls BBSRC £975,718 March 1, 2013 Feb. 28, 2018 Closed 39 Xylan arabinosyl transferases: identification and characterisation of their role in determining properties of grass cell walls BBSRC £3,239,470 April 14, 2013 Feb. 28, 2018 Closed 40 FiLAment Winding multi-nozzLE, traversing winding head for enabling production of composite high-preSSure vessels (FLAWLESS) Innovate UK £49,943 Nov. 1, 2022 April 29, 2023 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »