Home Projects More like: Improving Premium Steel Manufacturing through Automation [Clear] # Title Funder Funding Start End Status 1 Improving Premium Steel Manufacturing through Automation Innovate UK £698,566 Jan. 1, 2014 Dec. 31, 2015 Closed 2 Continuous Measurement of Liquid Steel Temperature and Chemistry EPSRC £0 Jan. 1, 2022 Dec. 31, 2025 Active 3 Continuous Measurement of Liquid Steel Temperature and Chemistry EPSRC £0 Jan. 1, 2022 Dec. 31, 2025 Active 4 Testing concrete-encased steel from the 1950s for direct reuse Innovate UK £40,503 March 31, 2022 March 30, 2023 Active 5 Deployment of ultrasonic melt flow enhancement technology to achieve energy savings of 27% across the energy intensive, injection moulded consumer packaging sector Innovate UK £5,542,770 March 1, 2022 Feb. 29, 2024 Active 6 Deployment of ultrasonic melt flow enhancement technology to achieve energy savings of 27% across the energy intensive, injection moulded food packaging sector Innovate UK £5,127,380 March 1, 2022 Feb. 29, 2024 Active 7 Free oxygen control in a digitally fired reheat furnace EPSRC £0 Sept. 30, 2022 Sept. 29, 2026 Active 8 Free oxygen control in a digitally fired reheat furnace EPSRC £0 Sept. 30, 2022 Sept. 30, 2026 Active 9 Digital_Lyo Innovate UK £4,992,320 June 30, 2023 June 30, 2025 Active 10 'CatContiCryst' - Continuous Manufacture of Li-ion battery Cathode Materials using Oscillating Baffled Reactor/ Crystalliser Technology ISCF £1,213,975 Feb. 1, 2023 Jan. 31, 2024 Active 11 REDUCTION OF ENERGY DEMAND IN PAPER MAKING USING ONLINE OPTIMISATION AND CONTROL EPSRC £600,358 Aug. 31, 2009 Nov. 30, 2011 Closed 12 REDUCTION OF ENERGY DEMAND IN PAPER MAKING USING ONLINE OPTIMISATION AND CONTROL EPSRC £303,136 May 31, 2009 Aug. 30, 2011 Closed 13 REDUCTION OF ENERGY DEMAND IN PAPER MAKING USING ONLINE OPTIMISATION AND CONTROL EPSRC £1,500,895 Aug. 31, 2009 Nov. 30, 2011 Closed 14 Performance of structural and fuel materials in molten lead-based fluids EPSRC £0 Sept. 19, 2021 Sept. 29, 2025 Active 15 Performance of structural and fuel materials in molten lead-based fluids EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 16 Uncovering Fundamental Mechanisms to Enable Sustainable Steel Manufacturing EPSRC £2,320,158 March 31, 2016 March 30, 2022 Closed 17 A New Energy Budget for Earth's Core and Implications for the Geomagnetic Field NERC £900,102 Jan. 1, 2015 Dec. 31, 2019 Closed 18 A New Energy Budget for Earth's Core and Implications for the Geomagnetic Field NERC £2,250,255 Jan. 1, 2015 Dec. 31, 2019 Closed 19 Purchase of a tandem LA-LIBS femtosecond laser system for the UK NERC £1,910,760 Jan. 22, 2021 Dec. 31, 2021 Closed 20 Fruitful Forecasts Innovate UK £592,616 Feb. 1, 2022 July 30, 2023 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »