# Title Funder Funding Start End Status
41 Effective Adsorbents for Establishing Solids Looping as a Next Generation NG PCC Technology EPSRC
£3,782,770
Jan. 1, 2013 Oct. 31, 2016 Closed
42 Performance Optimization of IT-SOFCs by Inkjet Printing on Porous Metal Substrates (JETCELL) EPSRC
£773,276
Nov. 1, 2011 March 30, 2015 Closed
43 Performance Optimization of IT-SOFCs by Inkjet Printing on Porous Metal Substrates (JETCELL) EPSRC
£1,933,190
Nov. 1, 2011 March 31, 2015 Closed
44 Detection of loss of grid event in distributed generation systems using pattern recognition EPSRC
£476,976
Oct. 31, 2012 April 29, 2016 Closed
45 Detection of loss of grid event in distributed generation systems using pattern recognition EPSRC
£1,192,440
Oct. 31, 2012 April 30, 2016 Closed
46 MAINTAiN - Multi-scAle INTegrity assessment for Advanced high-temperature Nuclear systems EPSRC
£1,970,165
March 31, 2018 Sept. 30, 2022 Closed
47 Extension to Transferability of Small-Specimen Data to Large-Scale Component Fracture Assessment (TRANSFER-EXT) EPSRC
£79,815
June 30, 2016 Sept. 30, 2016 Closed
48 Mitigating the effect of low inertia and low short-circuit level in HVDC-rich AC grids EPSRC
£591,264
Dec. 15, 2014 April 29, 2018 Closed
49 Mitigating the effect of low inertia and low short-circuit level in HVDC-rich AC grids EPSRC
£1,478,160
Dec. 15, 2014 April 30, 2018 Closed
50 Linking Microstructure to Neutron Irradiation Defects in Advanced Manufacture of Steels EPSRC
£3,325,150
Dec. 1, 2016 Nov. 30, 2020 Closed
51 Development and Integration of Biomass and Concentrating Photovoltaic System for Rural and Urban Energy Bridge: BioCPV EPSRC
£2,803,272
Nov. 1, 2011 Jan. 31, 2013 Closed
52 Development and Integration of Biomass and Concentrating Photovoltaic System for Rural and Urban Energy Bridge: BioCPV EPSRC
£2,037,252
Feb. 1, 2013 July 8, 2016 Closed
53 Development and Integration of Biomass and Concentrating Photovoltaic System for Rural and Urban Energy Bridge: BioCPV EPSRC
£5,093,130
Feb. 1, 2013 July 9, 2016 Closed
54 Development and Integration of Biomass and Concentrating Photovoltaic System for Rural and Urban Energy Bridge: BioCPV EPSRC
£7,008,180
Nov. 1, 2011 Jan. 31, 2013 Closed
55 IMPULSE - Advanced Industrial Manufacture of Next-Generation MARBN Steel for Cleaner Fossil Plant EPSRC
£527,622
March 1, 2016 Aug. 22, 2019 Closed
56 The Economics and Financing of Resilient Urban Infrastructure ESRC
£584,230
Jan. 2, 2018 Jan. 1, 2021 Closed
57 MAXFARM (MAXimizing wind Farm Aerodynamic Resource via advanced Modelling) EPSRC
£2,953,388
Nov. 2, 2015 April 30, 2019 Closed
58 MAXFARM (MAXimizing wind Farm Aerodynamic Resource via advanced Modelling) EPSRC
£7,383,470
Nov. 2, 2015 May 1, 2019 Closed
59 Enhanced Renewable Integration through Flexible Transmission Options (ERIFT) EPSRC
£1,760,862
March 31, 2013 March 30, 2016 Closed
60 Enhanced Renewable Integration through Flexible Transmission Options (ERIFT) EPSRC
£4,402,155
March 31, 2013 March 31, 2016 Closed
Reset