Home Projects More like: Computational and communication architectures for MMC VSC-HVDC Construction [Clear] # Title Funder Funding Start End Status 81 Medium Voltage DC Systems in Electricity Distribution Networks EPSRC £0 June 30, 2018 Dec. 31, 2021 Closed 82 Medium Voltage DC Systems in Electricity Distribution Networks EPSRC £0 June 30, 2018 Dec. 31, 2021 Closed 83 Enhanced Control and Operation of Doubly-Fed Induction Generator Based Wind Farm during Network Unbalance EPSRC £123,862 Aug. 31, 2007 Sept. 29, 2008 Closed 84 Enhanced Control and Operation of Doubly-Fed Induction Generator Based Wind Farm during Network Unbalance EPSRC £254,162 March 31, 2006 Aug. 30, 2007 Closed 85 Enhanced Control and Operation of Doubly-Fed Induction Generator Based Wind Farm during Network Unbalance EPSRC £635,405 March 31, 2006 Aug. 31, 2007 Closed 86 Enhanced Control and Operation of Doubly-Fed Induction Generator Based Wind Farm during Network Unbalance EPSRC £0 Aug. 31, 2007 Sept. 30, 2008 Closed 87 Design, build and testing of a 50 kVA SiC BJT inverter as a building block for high-power HVDC inverters EPSRC £417,522 Aug. 31, 2014 May 30, 2016 Closed 88 Design, build and testing of a 50 kVA SiC BJT inverter as a building block for high-power HVDC inverters EPSRC £104,080 Aug. 24, 2016 Nov. 24, 2016 Closed 89 Design, build and testing of a 50 kVA SiC BJT inverter as a building block for high-power HVDC inverters EPSRC £1,043,805 Aug. 31, 2014 May 31, 2016 Closed 90 Design, build and testing of a 50 kVA SiC BJT inverter as a building block for high-power HVDC inverters EPSRC £260,200 Aug. 24, 2016 Nov. 24, 2016 Closed 91 A Security Investigation of Power Line Communication EPSRC £0 Sept. 30, 2018 Sept. 29, 2022 Active 92 A Security Investigation of Power Line Communication EPSRC £0 Sept. 30, 2018 Sept. 30, 2022 Closed 93 NanocompEIM Phase II- Nanaocomposite Advanced Electrical Insulation System for Enhanced HVAC and HVDC Energy Networks Innovate UK £1,300,450 Sept. 30, 2016 Sept. 29, 2019 Closed 94 NanocompEIM Phase II- Nanaocomposite Advanced Electrical Insulation System for Enhanced HVAC and HVDC Energy Networks Innovate UK £3,251,125 Sept. 30, 2016 Sept. 30, 2019 Closed 95 PERFORMANCE COMPARISON OF TRADITIONAL AND EMERGING DOUBLY-FED GENERATOR TOPOLOGIES FOR GRID-CONNECTED WIND POWER APPLICATIONS EPSRC £270,652 Sept. 21, 2008 Sept. 20, 2011 Closed 96 PERFORMANCE COMPARISON OF TRADITIONAL AND EMERGING DOUBLY-FED GENERATOR TOPOLOGIES FOR GRID-CONNECTED WIND POWER APPLICATIONS EPSRC £265,792 Sept. 30, 2008 Sept. 29, 2011 Closed 97 PERFORMANCE COMPARISON OF TRADITIONAL AND EMERGING DOUBLY-FED GENERATOR TOPOLOGIES FOR GRID-CONNECTED WIND POWER APPLICATIONS EPSRC £676,630 Sept. 21, 2008 Sept. 21, 2011 Closed 98 High Frequency Power Conversion Using Wide Band-Gap Semiconductors EPSRC £0 Sept. 30, 2019 Sept. 29, 2023 Active 99 Stability and Control of Power Networks with Energy Storage (STABLE-NET) EPSRC £2,096,160 Sept. 29, 2014 March 28, 2018 Closed 100 Stability and Control of Power Networks with Energy Storage (STABLE-NET) EPSRC £5,240,400 Sept. 29, 2014 March 29, 2018 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »