Home Projects More like: Role of energy storage in enhancing operation and stability performance of sustainable power systems (RESTORES) [Clear] # Title Funder Funding Start End Status 1 Role of energy storage in enhancing operation and stability performance of sustainable power systems (RESTORES) EPSRC £2,039,914 June 30, 2014 June 29, 2017 Closed 2 Stability and Control of Power Networks with Energy Storage (STABLE-NET) EPSRC £2,096,160 Sept. 29, 2014 March 28, 2018 Closed 3 Stability and Control of Power Networks with Energy Storage (STABLE-NET) EPSRC £5,240,400 Sept. 29, 2014 March 29, 2018 Closed 4 Designing the next generation of wind turbine converter controllers for wind power applications: Enhancing the power system reliability, stability and EPSRC £0 Sept. 30, 2019 Sept. 30, 2023 Closed 5 Sustainable urban power supply through intelligent control and enhanced restoration of AC/DC networks EPSRC £1,209,122 March 31, 2020 March 30, 2023 Active 6 Sustainable urban power supply through intelligent control and enhanced restoration of AC/DC networks EPSRC £3,022,805 March 31, 2020 March 31, 2024 Active 7 Terahertz, Topology, Technology: Realising the potential of nanoscale Dirac materials using near-field terahertz spectroscopy UKRI £2,443,026 July 31, 2020 July 30, 2024 Active 8 Nonlinear Adaptive Control of Doubly-fed Induction Generator for Variable Speed Wind Turbine EPSRC £361,552 Oct. 29, 2012 Oct. 28, 2014 Closed 9 Nonlinear Adaptive Control of Doubly-fed Induction Generator for Variable Speed Wind Turbine EPSRC £903,880 Oct. 29, 2012 Oct. 28, 2014 Closed 10 Aggregative charging control of electric vehicle populations EPSRC £200,828 Jan. 1, 2018 April 29, 2019 Closed 11 Aggregative charging control of electric vehicle populations EPSRC £502,070 Jan. 1, 2018 April 30, 2019 Closed 12 Addressing the complexity of future power system dynamic behaviour UKRI £2,433,312 Dec. 1, 2019 March 31, 2024 Active 13 Addressing the complexity of future power system dynamic behaviour FLF £6,083,280 Dec. 1, 2019 Nov. 30, 2024 Active 14 MY-STORE: Multi-energY storage-Social, TechnO-economic, Regulatory and Environmental assessment under uncertainty EPSRC £2,536,330 Jan. 1, 2016 Nov. 20, 2019 Closed 15 MY-STORE: Multi-energY storage-Social, TechnO-economic, Regulatory and Environmental assessment under uncertainty EPSRC £6,340,825 Jan. 1, 2016 Nov. 20, 2019 Closed 16 Advanced Communication and Control for the Prevention of Blackouts (ACCEPT) EPSRC £1,959,012 Feb. 1, 2014 Dec. 31, 2017 Closed 17 Advanced Communication and Control for the Prevention of Blackouts (ACCEPT) EPSRC £4,897,530 Feb. 1, 2014 Dec. 31, 2017 Closed 18 Nash equilibria for load balancing in networked power systems EPSRC £994,762 March 31, 2016 May 10, 2019 Closed 19 Nash equilibria for load balancing in networked power systems EPSRC £2,486,905 March 31, 2016 May 11, 2019 Closed 20 Dynamic Organic Rankine Cycle for Recovering Industrial Waste Heat EPSRC £196,960 Feb. 7, 2016 April 29, 2017 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 »