Home Projects More like: Balanced Energy Networks [Clear] # Title Funder Funding Start End Status 81 Electricity Satnav - Electricity Smart Availability Topology of Network for Abundant electric Vehicles EPSRC £52,276 Oct. 14, 2019 June 29, 2020 Closed 82 Electricity Satnav - Electricity Smart Availability Topology of Network for Abundant electric Vehicles EPSRC £402,520 Aug. 31, 2017 Oct. 13, 2019 Closed 83 Electricity Satnav - Electricity Smart Availability Topology of Network for Abundant electric Vehicles EPSRC £130,690 Oct. 14, 2019 June 30, 2020 Closed 84 Electricity Satnav - Electricity Smart Availability Topology of Network for Abundant electric Vehicles EPSRC £1,006,300 Aug. 31, 2017 Oct. 14, 2019 Closed 85 SaFEGround - Sustainable, Flexible and Efficient Ground-source heating and cooling systems EPSRC £3,041,010 Aug. 31, 2021 Aug. 30, 2024 Active 86 SaFEGround - Sustainable, Flexible and Efficient Ground-source heating and cooling systems EPSRC £7,602,525 Aug. 31, 2021 Aug. 31, 2024 Active 87 Energy Storage for Low Carbon Grids EPSRC £11,242,032 Sept. 30, 2012 June 29, 2018 Closed 88 Energy Storage for Low Carbon Grids EPSRC £28,105,080 Sept. 30, 2012 June 30, 2018 Closed 89 Forecasting Climate Change Impacts on Urban Electricity Distribution Network Loads Innovate UK £486,620 June 30, 2015 June 29, 2017 Closed 90 Forecasting Climate Change Impacts on Urban Electricity Distribution Network Loads Innovate UK £1,216,550 June 30, 2015 June 30, 2017 Closed 91 Whole Energy System: Levenmouth Integrated Demonstration (WESLID) - Concept and Design Study Innovate UK £283,910 Dec. 1, 2018 May 30, 2019 Closed 92 Whole Energy System: Levenmouth Integrated Demonstration (WESLID) - Concept and Design Study ISCF £709,775 Dec. 1, 2018 May 31, 2019 Closed 93 The Autonomic Power System EPSRC £6,858,198 Sept. 30, 2011 Oct. 31, 2016 Closed 94 The Autonomic Power System EPSRC £17,145,495 Sept. 30, 2011 Oct. 31, 2016 Closed 95 High-Performance Heat-Powered Heat-Pumps (HP3) EPSRC £1,959,620 June 30, 2023 June 30, 2026 Active 96 Data-Driven Predictive Control for Ensuring Grid Security with High Penetration of Wind Energy EPSRC £0 Sept. 30, 2022 March 30, 2026 Active 97 Multi-energy Control of Cyber-Physical Urban Energy Systems (MC2) EPSRC £1,625,486 March 31, 2020 Sept. 29, 2023 Active 98 Multi-energy Control of Cyber-Physical Urban Energy Systems (MC2) EPSRC £4,063,715 March 31, 2020 March 31, 2024 Active 99 FITS-LCD: Fabric Integrated Thermal Storage for Low-Carbon Dwellings EPSRC £1,997,756 March 31, 2016 March 31, 2019 Closed 100 FITS-LCD: Fabric Integrated Thermal Storage for Low-Carbon Dwellings EPSRC £4,994,390 March 31, 2016 March 31, 2019 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »