# Title Funder Funding Start End Status
61 The Multi-float WaveSub Wave Energy Converter EPSRC
£101,106
Sept. 30, 2016 Sept. 29, 2017 Closed
62 The Multi-float WaveSub Wave Energy Converter EPSRC
£252,765
Sept. 30, 2016 Sept. 30, 2017 Closed
63 Process Intensification for Post-combustion Carbon Capture using Rotating Packed Bed through Systems Engineering Techniques EPSRC
£2,548,872
Sept. 30, 2014 Sept. 29, 2016 Closed
64 Process Intensification for Post-combustion Carbon Capture using Rotating Packed Bed through Systems Engineering Techniques EPSRC
£1,455,818
Sept. 30, 2016 June 29, 2019 Closed
65 Process Intensification for Post-combustion Carbon Capture using Rotating Packed Bed through Systems Engineering Techniques EPSRC
£6,372,180
Sept. 30, 2014 Sept. 30, 2016 Closed
66 Process Intensification for Post-combustion Carbon Capture using Rotating Packed Bed through Systems Engineering Techniques EPSRC
£3,639,545
Sept. 30, 2016 June 30, 2019 Closed
67 Selective Exhaust Gas Recirculation for Carbon Capture with Gas Turbines: Integration, Intensification, Scale-up and Optimisation. EPSRC
£2,199,782
Dec. 1, 2014 May 30, 2018 Closed
68 Selective Exhaust Gas Recirculation for Carbon Capture with Gas Turbines: Integration, Intensification, Scale-up and Optimisation. EPSRC
£5,499,455
Dec. 1, 2014 May 31, 2018 Closed
69 A New Integrated Approach to Measurements and Modelling of Combustion Generated Particulate Matter EPSRC
£1,155,722
April 30, 2011 Oct. 31, 2015 Closed
70 Investigating Corrosion in Supercritical Fluids EPSRC
£565,452
Sept. 10, 2019 March 10, 2023 Active
71 Investigating Corrosion in Supercritical Fluids EPSRC
£1,413,630
Sept. 10, 2019 March 10, 2023 Closed
72 CO2 Post-Combustion Capture Using Amine Impregnated Synthetic Zeolites EPSRC
£960,510
Jan. 1, 2014 Dec. 31, 2016 Closed
73 From Processing to Simulated In-Reactor Performance of Zr Cladding. EPSRC
£982,574
March 17, 2016 March 16, 2020 Closed
74 From Processing to Simulated In-Reactor Performance of Zr Cladding. EPSRC
£2,456,435
March 17, 2016 March 16, 2020 Closed
75 A new concept for compact radiation shielding: Reactive sintered tungsten borocarbides EPSRC
£2,236,044
March 1, 2021 Feb. 28, 2026 Active
76 A new concept for compact radiation shielding: Reactive sintered tungsten borocarbides EPSRC
£5,590,110
March 1, 2021 Feb. 28, 2026 Active
Reset