Home Projects More like: Parallelising Mixed-Integer Optimisation: Energy Efficiency Applications [Clear] # Title Funder Funding Start End Status 1 Parallelising Mixed-Integer Optimisation: Energy Efficiency Applications EPSRC £201,484 March 1, 2017 Feb. 28, 2018 Closed 2 Combined Heat and Photo Voltaics (CHPV) EPSRC £359,498 Nov. 1, 2014 Dec. 31, 2016 Closed 3 Combined Heat and Photo Voltaics (CHPV) EPSRC £898,745 Nov. 1, 2014 Dec. 31, 2016 Closed 4 Development of time-parallel numerical integration algorithms using probabilistic methods with applications to magnetic fusion plasma. EPSRC £0 Sept. 30, 2019 Sept. 30, 2023 Closed 5 Algorithms for Industrial Demand-Side Management Under Uncertainty EPSRC £701,084 Aug. 25, 2020 Aug. 24, 2023 Active 6 Algorithms for Industrial Demand-Side Management Under Uncertainty EPSRC £1,752,710 Aug. 25, 2020 Aug. 25, 2023 Closed 7 Generalised high-order Eulerian Smoothed Particle Hydrodynamics for internal flows applied to flow-induced vibration and nuclear tube banks EPSRC £1,382,414 Nov. 1, 2017 July 30, 2021 Closed 8 Computational Methods for Anaerobic Digestion Optimization (CoMAnDO) EPSRC £682,962 March 31, 2018 Aug. 30, 2021 Closed 9 Computational Methods for Anaerobic Digestion Optimization (CoMAnDO) EPSRC £1,707,405 March 31, 2018 Aug. 31, 2021 Closed 10 Biogas production from high volume industrial effluents at ambient temperatures (AmbiGAS) BBSRC £798,210 Aug. 31, 2013 June 29, 2017 Closed 11 Biogas production from high volume industrial effluents at ambient temperatures (AmbiGAS) BBSRC £1,995,525 Aug. 31, 2013 June 30, 2017 Closed 12 G8 Multilateral Research Funding Nu-FuSE EPSRC £1,976,510 April 3, 2011 Sept. 30, 2014 Closed 13 Unlocking the Potential of Model-Predictive Control in Non-domestic Building Energy Management: Automated Configuration and Optimisation of Control EPSRC £1,081,208 July 31, 2016 April 29, 2020 Closed 14 Unlocking the Potential of Model-Predictive Control in Non-domestic Building Energy Management: Automated Configuration and Optimisation of Control EPSRC £2,703,020 July 31, 2016 April 30, 2020 Closed 15 Stochastic analysis of the neutron transport equation and applications to nuclear safety EPSRC £2,211,305 May 15, 2017 Dec. 31, 2021 Closed 16 Transfer Optimisation System for Adaptive Automated Nature-Inspired Optimisation FLF £5,488,210 April 30, 2019 April 30, 2023 Closed 17 Optimization in Fluid Mechanics EPSRC £645,200 Dec. 1, 2016 Aug. 30, 2017 Closed 18 Optimization in Fluid Mechanics EPSRC £522,318 Aug. 31, 2017 March 30, 2020 Closed 19 Real World Optimisation with Life-Long Learning EPSRC £476,136 Jan. 1, 2013 Dec. 31, 2015 Closed 20 Computational Modelling and Optimisation of Carbon Capture Reactors EPSRC £2,904,795 Jan. 30, 2013 Sept. 11, 2015 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 »