Home Projects More like: Inverter connected battery technology with advanced fault ride through capability on LV grid system to help offset the need for standby generation [Clear] # Title Funder Funding Start End Status 1 Inverter connected battery technology with advanced fault ride through capability on LV grid system to help offset the need for standby generation EPSRC £196,306 Oct. 4, 2010 Jan. 4, 2013 Closed 2 Detection of loss of grid event in distributed generation systems using pattern recognition EPSRC £476,976 Oct. 31, 2012 April 29, 2016 Closed 3 Detection of loss of grid event in distributed generation systems using pattern recognition EPSRC £1,192,440 Oct. 31, 2012 April 30, 2016 Closed 4 Carbon Nanotube Based Textiles for Energy Storage Applications EPSRC £509,816 Sept. 30, 2013 March 30, 2017 Closed 5 Carbon Nanotube Based Textiles for Energy Storage Applications EPSRC £1,274,540 Sept. 30, 2013 March 31, 2017 Closed 6 Battery Characterisation and Management - the key to Smart Grids and the Integration of Electric Vehicles EPSRC £2,677,438 July 10, 2013 April 27, 2017 Closed 7 Battery Characterisation and Management - the key to Smart Grids and the Integration of Electric Vehicles EPSRC £6,693,595 July 10, 2013 April 28, 2017 Closed 8 System Architecture Challenges: Supergen+ for HubNet EPSRC £1,527,958 Jan. 1, 2015 Dec. 31, 2016 Closed 9 System Architecture Challenges: Supergen+ for HubNet EPSRC £3,819,895 Jan. 1, 2015 Dec. 31, 2016 Closed 10 Nonlinear Adaptive Control of Doubly-fed Induction Generator for Variable Speed Wind Turbine EPSRC £361,552 Oct. 29, 2012 Oct. 28, 2014 Closed 11 Nonlinear Adaptive Control of Doubly-fed Induction Generator for Variable Speed Wind Turbine EPSRC £903,880 Oct. 29, 2012 Oct. 28, 2014 Closed 12 ISCF Wave 1: Improved lifetime performance and safety of electrochemical energy stores through functionalization of passive materials and components EPSRC £2,006,842 Sept. 30, 2017 May 30, 2021 Closed 13 ISCF Wave 1: Improved lifetime performance and safety of electrochemical energy stores through functionalization of passive materials and components UUI £5,017,105 Sept. 30, 2017 May 31, 2021 Closed 14 Reliable and Efficient System for Community Energy Solution- RESCUES EPSRC £1,910,184 Feb. 1, 2014 March 28, 2018 Closed 15 Reliable and Efficient System for Community Energy Solution- RESCUES EPSRC £4,775,460 Feb. 1, 2014 March 29, 2018 Closed 16 ISCF Wave 1: High Power Material Hybridised Battery (HiPoBat) EPSRC £1,157,184 Nov. 9, 2017 May 7, 2021 Closed 17 ISCF Wave 1: High Power Material Hybridised Battery (HiPoBat) UUI £2,892,960 Nov. 9, 2017 May 8, 2021 Closed 18 SYNAPS - SYNchronous Automation and Protection System EPSRC £486,570 May 31, 2015 May 30, 2017 Closed 19 SYNAPS - SYNchronous Automation and Protection System EPSRC £1,216,425 May 31, 2015 May 31, 2017 Closed 20 DC Networks with DC/DC Converters for Integration of Large Renewable Sources EPSRC £1,469,570 May 30, 2013 Dec. 16, 2016 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 »