Home Projects More like: GigaWatt-Hour Subsurface Thermal Energy storAge: Engineered structures and legacy Mine shafts: STEaM [Clear] # Title Funder Funding Start End Status 1 GigaWatt-Hour Subsurface Thermal Energy storAge: Engineered structures and legacy Mine shafts: STEaM EPSRC £978,269 Aug. 12, 2022 Aug. 11, 2024 Active 2 GigaWatt-Hour Subsurface Thermal Energy storAge: Engineered structures and legacy Mine shafts: STEaM EPSRC £215,571 June 30, 2022 June 29, 2024 Active 3 Mapping of subsurface minewater resources against surface demands EPSRC £0 March 1, 2022 Aug. 30, 2025 Active 4 Mapping of subsurface minewater resources against surface demands EPSRC £0 March 1, 2022 Aug. 31, 2025 Active 5 Geothermal Energy from Mines and Solar-Geothermal heat (GEMS) EPSRC £2,843,520 Aug. 31, 2021 Aug. 30, 2024 Active 6 Geothermal Energy from Mines and Solar-Geothermal heat (GEMS) EPSRC £7,108,800 Aug. 31, 2021 Aug. 31, 2024 Active 7 Optimisation of thermal energy storage in abandoned flooded mine workings EPSRC £0 Sept. 30, 2018 May 29, 2022 Active 8 Optimisation of thermal energy storage in abandoned flooded mine workings EPSRC £0 Sept. 30, 2018 May 30, 2022 Closed 9 Development of gravity driven electrical energy storage system Innovate UK £50,000 April 30, 2012 Dec. 31, 2012 Closed 10 Gravity Mine - Low cost energy storage for Chile’s mining cluster Innovate UK £41,482 Jan. 1, 2022 March 30, 2022 Closed 11 Gravity Mine - Low cost energy storage for Chile’s mining cluster Innovate UK £103,705 Jan. 1, 2022 March 31, 2022 Closed 12 Can heat stored within existing mine infrastructure be used to deliver flexibility to an energy system which is becoming more complex as it transition EPSRC £0 Sept. 30, 2019 Sept. 29, 2023 Active 13 Can heat stored within existing mine infrastructure be used to deliver flexibility to an energy system which is becoming more complex as it transition EPSRC £0 Sept. 30, 2019 Sept. 30, 2023 Closed 14 Modelling Geothermal Heat Extraction from Abandoned Mine Workings and Associated Ground Stability Issues. NERC £0 Aug. 31, 2017 Nov. 30, 2022 Closed 15 Passive Leached Waste Metal Remediation Innovate UK £322,277 Sept. 30, 2022 March 31, 2024 Active 16 Passive Leached Waste Metal Remediation Innovate UK £1,354,305 Sept. 30, 2022 March 31, 2024 Active 17 PROMT: Philippines Remediation of Mine Tailings NERC £1,314,364 Oct. 25, 2021 May 30, 2025 Active 18 PROMT: Philippines Remediation of Mine Tailings NERC £719,536 Oct. 25, 2021 Oct. 24, 2024 Active 19 PROMT: Philippines Remediation of Mine Tailings NERC £580,392 Oct. 25, 2021 Oct. 24, 2024 Active 20 Design and optimisation of a low carbon heating network for the Clyde Gateway development EPSRC £0 Sept. 30, 2017 Sept. 29, 2021 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »