# Title Funder Funding Start End Status
21 NanocompEIM Phase 2 - Nanocomposite Advanced Electrical Insulation Systems for Enhanced HVAC and HVDC Energy Networks EPSRC
£751,414
Sept. 30, 2016 Dec. 31, 2019 Closed
22 NanocompEIM Phase 2 - Nanocomposite Advanced Electrical Insulation Systems for Enhanced HVAC and HVDC Energy Networks EPSRC
£1,878,535
Sept. 30, 2016 Dec. 31, 2019 Closed
23 Wind2DC: Medium Voltage DC Power Take Off Technologies for Floating Offshore Wind Turbine Energy Conversion and Collection Systems EPSRC
£4,568,070
June 30, 2023 Feb. 28, 2027 Active
24 LIQUID CRYSTALLINE HYBRID DIELECTRICS FOR MONODOMAIN ORGANIC SEMICONDUCTORS EPSRC
£722,356
Jan. 9, 2012 March 8, 2015 Closed
25 LIQUID CRYSTALLINE HYBRID DIELECTRICS FOR MONODOMAIN ORGANIC SEMICONDUCTORS EPSRC
£1,034,378
March 19, 2012 March 18, 2015 Closed
26 LIQUID CRYSTALLINE HYBRID DIELECTRICS FOR MONODOMAIN ORGANIC SEMICONDUCTORS EPSRC
£2,585,945
March 19, 2012 March 18, 2015 Closed
27 Using ferroelectric domain walls for active control of heat flow at the nanoscale UKRI
£1,925,604
Feb. 1, 2021 Jan. 31, 2025 Active
28 Using ferroelectric domain walls for active control of heat flow at the nanoscale FLF
£4,814,010
Feb. 1, 2021 Jan. 31, 2025 Active
29 High-Integrity busbars for electric vehicle battery systems ISCF
£1,258,105
July 31, 2021 July 31, 2022 Closed
30 SYNAPS - SYNchronous Automation and Protection System EPSRC
£486,570
May 31, 2015 May 30, 2017 Closed
31 SYNAPS (Synchronous Analysis and Protection System) EPSRC
£398,590
Nov. 1, 2015 Jan. 31, 2018 Closed
32 SYNAPS - SYNchronous Automation and Protection System EPSRC
£1,216,425
May 31, 2015 May 31, 2017 Closed
33 SYNAPS (Synchronous Analysis and Protection System) EPSRC
£996,475
Nov. 1, 2015 Jan. 31, 2018 Closed
34 Predictive Reliability Modelling and Characterization of Silicon Carbide Power MOS-Transistors in Grid-Connected Voltage Source Converters EPSRC
£199,530
April 16, 2013 Aug. 15, 2015 Closed
35 Predictive Reliability Modelling and Characterization of Silicon Carbide Power MOS-Transistors in Grid-Connected Voltage Source Converters EPSRC
£498,825
April 16, 2013 Aug. 16, 2015 Closed
36 Enhanced Electrical and Thermal Rating Power Cables for Renewables Connections in Developing Countries EPSRC
£222,004
March 1, 2017 Feb. 28, 2018 Closed
37 Enhanced Electrical and Thermal Rating Power Cables for Renewables Connections in Developing Countries EPSRC
£555,010
March 1, 2017 Feb. 28, 2018 Closed
38 Development of ultra-high-speed image-based technology for the study of lightning and lightning interactions EPSRC
£0
Sept. 30, 2022 March 30, 2026 Active
39 Layered Oxides Thermoelectrics for High Temperature Waste heat Recovery EPSRC
£201,158
Sept. 30, 2016 Dec. 31, 2017 Closed
40 Layered Oxides Thermoelectrics for High Temperature Waste heat Recovery EPSRC
£502,895
Sept. 30, 2016 Dec. 31, 2017 Closed
Reset