Home Projects More like: Low Cost Nuclear Phase 1 [Clear] # Title Funder Funding Start End Status 1 Low Cost Nuclear Phase 1 Innovate UK £35,477,386 Nov. 1, 2019 June 29, 2021 Closed 2 TRANSCEND: Transformative Science and Engineering for Nuclear Decommissioning EPSRC £9,174,840 Sept. 30, 2018 Sept. 29, 2023 Active 3 TRANSCEND: Transformative Science and Engineering for Nuclear Decommissioning EPSRC £22,937,100 Sept. 30, 2018 Sept. 30, 2023 Closed 4 Tackling the nuclear legacy: Application of low-energy electrokinetic clean-up techniques to problem nuclear contaminants and sites NERC £0 Sept. 30, 2020 March 31, 2024 Active 5 Tackling the nuclear legacy: Application of low-energy electrokinetic clean-up techniques to problem nuclear contaminants and sites NERC £0 Sept. 30, 2020 March 31, 2024 Active 6 Step Change Adsorbents and Processes for CO2 Capture. EPSRC £7,904,405 Nov. 1, 2009 Oct. 31, 2013 Closed 7 Feasibility Study of Modular Energy Conversion System as a Gas Let-down Expander Innovate UK £96,976 Feb. 1, 2022 Oct. 31, 2022 Closed 8 Feasibility Study of Modular Energy Conversion System as a Gas Let-down Expander ISCF £242,440 Feb. 1, 2022 Oct. 31, 2022 Closed 9 Collaborative knowledge-based DfMA approach to build cost-efficient, low-impact and high performance houses Innovate UK £1,433,670 March 1, 2019 Feb. 28, 2021 Closed 10 Collaborative knowledge-based DfMA approach to build cost-efficient, low-impact and high performance houses ISCF £3,584,175 March 1, 2019 Feb. 28, 2021 Closed 11 Modular Gas Turbine - Aerodynamic and Thermodynamic design of Heat Management Systems (Accelerating Net Zero using Advanced Fluids). EPSRC £0 Sept. 30, 2022 Sept. 29, 2026 Active 12 Towards Affordable, Closed-Loop Recyclable Future Low Carbon Vehicle Structures - TARF-LCV EPSRC £8,442,962 Dec. 1, 2011 May 30, 2016 Closed 13 Spectroscopy-driven design of an efficient photocatalyst for CO2 reduction (Ext.) EPSRC £1,255,392 Jan. 1, 2018 June 29, 2021 Closed 14 Spectroscopy-driven design of an efficient photocatalyst for CO2 reduction (Ext.) EPSRC £3,138,480 Jan. 1, 2018 June 30, 2021 Closed 15 Noise and Vibration Data Compressor (NVCOMP) - embeddable health monitoring solution to assist in the capture and replay of events to identify deterioration / damage in nuclear plant Innovate UK £2,826,610 April 30, 2015 Oct. 31, 2018 Closed 16 Development of PEMD for Nuclear Coolant Systems Innovate UK £469,088 Dec. 1, 2020 Aug. 30, 2021 Closed 17 Development of PEMD for Nuclear Coolant Systems ISCF £1,172,720 Dec. 1, 2020 Aug. 31, 2021 Closed 18 Nuclear Fission Reactor Thermal-Hydraulics (NUFRETH) - UKAEA EPSRC £7,764,780 Sept. 30, 2021 Sept. 29, 2023 Active 19 NUclear Fission REactor Thermal-Hydraulics (NUFRETH) EPSRC £50,784 Sept. 30, 2021 Sept. 29, 2023 Active 20 NUclear Fission REactor Thermal-Hydraulics (NUFRETH) EPSRC £126,960 Sept. 30, 2021 Sept. 30, 2023 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »