Home Projects More like: Queen Mary University of London and Deregallera Limited [Clear] # Title Funder Funding Start End Status 81 FlexTECC: Flexible Timing of Energy Consumption in Communities EPSRC £992,952 June 28, 2018 Dec. 28, 2021 Closed 82 Movement ecology: the role of environmental cues and sensory mechanisms in bat navigation NERC £115,980 Jan. 1, 2013 Dec. 31, 2013 Closed 83 Integrated offshore CO2 reservoir monitoring feasibility study Innovate UK £115,804 Sept. 30, 2020 Dec. 31, 2020 Closed 84 Iron biogeobatteries are sustainable electron sources and sinks in the environment UKRI £2,444,090 Jan. 1, 2022 Dec. 31, 2025 Active 85 Measurement and modelling of electrical, transport and phase-change phenomena and application to Vacuum Arc Remelting for Optimal Material Quality EPSRC £265,335 Oct. 31, 2006 Oct. 30, 2009 Closed 86 Measurement and modelling of electrical, transport and phase-change phenomena and application to Vacuum Arc Remelting for Optimal Material Quality EPSRC £508,230 Dec. 21, 2006 Dec. 20, 2009 Closed 87 Measurement and modelling of electrical, transport and phase-change phenomena and application to Vacuum Arc Remelting for Optimal Material Quality EPSRC £507,561 July 2, 2006 Oct. 1, 2009 Closed 88 Data Mining of Transformer Frequency Response Analysis (FRA) Results for Characterisation and Interpretation EPSRC £0 Sept. 30, 2017 Sept. 30, 2021 Closed 89 Utilising cycle-accurate architectural simulation to aid in the design space exploration of future HPC hardware. EPSRC £0 Sept. 30, 2020 March 31, 2024 Active 90 Molecular mechanism and engineering of P450 peroxygenases for synthetic biology applications BBSRC £924,162 June 30, 2016 June 29, 2019 Closed 91 Molecular mechanism and engineering of P450 peroxygenases for synthetic biology applications BBSRC £2,310,405 June 30, 2016 June 30, 2019 Closed 92 ULECES: Ultra low energy cement synthesis: A radical process change to achieve green and sustainable technologies EPSRC £1,240,862 Jan. 7, 2008 July 5, 2011 Closed 93 ULECES: Ultra low energy cement synthesis: A radical process change to achieve green and sustainable technologies EPSRC £3,102,155 Jan. 7, 2008 July 6, 2011 Closed 94 MUSERGEN: MultiUSER equipment for GENe identification in biosciences and biotechnology BBSRC £573,998 Sept. 27, 2020 Sept. 26, 2021 Closed 95 MUSERGEN: MultiUSER equipment for GENe identification in biosciences and biotechnology BBSRC £1,434,995 Sept. 27, 2020 Sept. 27, 2021 Closed 96 Project Merchant Innovate UK £1,250,155 April 30, 2013 Nov. 30, 2014 Closed 97 ENVIRO-COAT: ENVIROnmentally assisted, engineered Corrosion prOducts for Aqueous corrosion miTigation EPSRC £1,733,840 March 31, 2020 March 31, 2023 Closed 98 Quantifying and Monitoring Potential Ecosystem Impacts of Geological Carbon Storage (QICS) NERC £91,386 April 30, 2010 March 30, 2014 Closed 99 Quantifying and Monitoring Potential Ecosystem Impacts of Geological Carbon Storage NERC £346,458 April 29, 2010 April 28, 2013 Closed 100 Quantifying and Monitoring Potential Ecosystem Impacts of Geological Carbon Storage NERC £696,610 April 30, 2010 March 30, 2014 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »