Home Projects More like: High Quality Syngas from the Catalytic Gasification of Biomass Wastes [Clear] # Title Funder Funding Start End Status 81 Beyond biorecovery: environmental win-win by biorefining of metallic wastes into new functional materials (B3) NERC £1,550,720 Aug. 28, 2014 March 31, 2019 Closed 82 Beyond Biorecovery: environmental win-win by biorefining of metallic wastes into new functional materials (B3) NERC £662,970 Aug. 28, 2014 May 31, 2018 Closed 83 Newton fund: Waste CO2 and biomass based chemical synthesis for the green economy Newton Fund £188,990 Jan. 1, 2015 Dec. 31, 2015 Closed 84 Biogas production from high volume industrial effluents at ambient temperatures (AmbiGAS) BBSRC £798,210 Aug. 31, 2013 June 29, 2017 Closed 85 Biogas production from high volume industrial effluents at ambient temperatures (AmbiGAS) BBSRC £1,995,525 Aug. 31, 2013 June 30, 2017 Closed 86 Carbon Capture in the Refining Process (First Grant Scheme) EPSRC £500,995 Sept. 30, 2012 Sept. 30, 2013 Closed 87 CO2 Post-Combustion Capture Using Amine Impregnated Synthetic Zeolites EPSRC £960,510 Jan. 1, 2014 Dec. 31, 2016 Closed 88 Assessment of Integrated Microalgal-Bacterial Ecosystems for Bioenergy Production - Optimization-based Methodology EPSRC £198,762 Feb. 1, 2012 Jan. 31, 2013 Closed 89 Assessment of Integrated Microalgal-Bacterial Ecosystems for Bioenergy Production - Optimization-based Methodology EPSRC £496,905 Feb. 1, 2012 Jan. 31, 2013 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »