Home Projects More like: Tidal Turbine Blades - Maximising Reliability and Performance and Reducing Cost (BMAX) [Clear] # Title Funder Funding Start End Status 1 Tidal Turbine Blades - Maximising Reliability and Performance and Reducing Cost (BMAX) Innovate UK £1,109,806 Aug. 31, 2010 Nov. 30, 2013 Closed 2 Studies of coatings, lifetime and circular economy of resin-wood composites EPSRC £0 Sept. 30, 2019 July 30, 2021 Closed 3 Studies of coatings, lifetime and circular economy of resin-wood composites EPSRC £0 Sept. 30, 2019 July 31, 2021 Closed 4 TSB Development of an innovative radar absorbing composite structure for wind turbine blades Innovate UK £782,832 Feb. 1, 2008 Aug. 30, 2010 Closed 5 resinSENSE - real-time, on-line monitoring of resin mix-ratio monitoring system Innovate UK £194,266 Aug. 31, 2022 Sept. 29, 2023 Active 6 resinSENSE - real-time, on-line monitoring of resin mix-ratio monitoring system Innovate UK £971,330 Aug. 31, 2022 Sept. 30, 2023 Closed 7 Developing liquid acrylic resin-based composites for marine renewable energy and ship building applications EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 8 Developing liquid acrylic resin-based composites for marine renewable energy and ship building applications EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 9 Integrating with Renewable Energy sources: Low Pressure Steam Turbine Last Stage Blade Durability EPSRC £0 Sept. 25, 2019 March 30, 2023 Active 10 Integrating with Renewable Energy sources: Low Pressure Steam Turbine Last Stage Blade Durability EPSRC £0 Sept. 30, 2019 March 31, 2023 Closed 11 BONDIFI - Bioresin Optimisation for Needed Development in the Foundation Industries Innovate UK £30,000 Feb. 1, 2022 March 30, 2022 Closed 12 Novel co-blended polymer matrix systems for fire resistant structural marine composites EPSRC £854,158 July 18, 2010 July 17, 2014 Closed 13 Novel co-blended polymer matrix systems for fire resistant structural marine composites EPSRC £696,672 Nov. 1, 2010 Oct. 31, 2014 Closed 14 Novel co-blended polymer matrix systems for fire resistant structural marine composites EPSRC £2,135,395 July 18, 2010 July 18, 2014 Closed 15 Characterisation of short crack growth behaviour in a notch stress field under varying block loading cycles in steam turbine blade material EPSRC £0 Feb. 1, 2018 Feb. 28, 2022 Closed 16 Characterisation of short crack growth behaviour in a notch stress field under varying block loading cycles in steam turbine blade material EPSRC, NERC £0 Feb. 1, 2018 Feb. 28, 2022 Closed 17 Structural Composites Research Facility (SCRF) EPSRC £2,799,560 May 31, 2017 Nov. 30, 2020 Closed 18 Structural Composites Research Facility (SCRF) EPSRC £6,998,900 May 31, 2017 Nov. 30, 2020 Closed 19 Industrialising DAAT®, a novel structural adhesive bonding tape Innovate UK £475,148 Nov. 1, 2020 Oct. 30, 2021 Closed 20 Industrialising DAAT®, a novel structural adhesive bonding tape Innovate UK £1,187,870 Nov. 1, 2020 Oct. 31, 2021 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »