Home Projects More like: a novel low cost method for reducing nitrate leaching in soil [Clear] # Title Funder Funding Start End Status 1 a novel low cost method for reducing nitrate leaching in soil BBSRC £239,836 Nov. 5, 2012 Nov. 4, 2013 Closed 2 Urban green infrastructure: optimising local food and fuel production for regional sustainability and resilience EPSRC £1,577,060 May 31, 2016 May 30, 2021 Closed 3 Urban green infrastructure: optimising local food and fuel production for regional sustainability and resilience EPSRC £3,942,650 May 31, 2016 May 31, 2021 Closed 4 Using Rammed Earth Materials for Building-Integrated Passive Air Conditioning EPSRC £383,916 Jan. 29, 2007 July 27, 2009 Closed 5 Using Rammed Earth Materials for Building-Integrated Passive Air Conditioning EPSRC £959,790 Jan. 29, 2007 July 28, 2009 Closed 6 A novel biocatalyst platform for biobased-synthesis of 1,3-propanediol Innovate UK £819,130 Feb. 1, 2021 Jan. 31, 2022 Closed 7 A novel biocatalyst platform for biobased-synthesis of 1,3-propanediol ISCF £2,047,825 Feb. 1, 2021 Jan. 31, 2022 Closed 8 Fuel from biorenewable polyols: A new catalytic route EPSRC £1,624,278 Aug. 31, 2017 Dec. 31, 2020 Closed 9 Fuel from biorenewable polyols: A new catalytic route EPSRC £4,060,695 Aug. 31, 2017 Dec. 31, 2020 Closed 10 Quantifying the true carbon removal potential of enhanced rock weathering NERC £4,201,695 Feb. 16, 2024 Feb. 15, 2027 Active 11 Hydra - Multi-headed FFF 3D Printer Hardware Innovate UK £186,712 Sept. 30, 2022 Sept. 29, 2023 Active 12 HYSTOR - Composite Electroformed Hydrogen Tank Innovate UK £416,147 March 31, 2021 Sept. 29, 2022 Active 13 Understanding biopolymer clusters formation in microalgae systems for wastewater: application to membrane photo-bioreactors EPSRC £201,550 May 31, 2018 Dec. 31, 2019 Closed 14 Understanding biopolymer clusters formation in microalgae systems for wastewater: application to membrane photo-bioreactors EPSRC £503,875 May 31, 2018 Dec. 31, 2019 Closed 15 HempSil Board - a low carbon breathable insulating plasterboard Innovate UK £271,665 July 31, 2023 Jan. 31, 2024 Active 16 In Situ Incubation and Filtration System for the Pelagic Ocean (InSIncFS) NERC £749,223 Nov. 7, 2022 July 5, 2024 Active 17 Process optimisation of 2,3-epoxy-1-propanol for downstream speciality chemical production. Innovate UK £110,720 Feb. 1, 2017 Jan. 31, 2018 Closed 18 Process optimisation of 2,3-epoxy-1-propanol for downstream speciality chemical production. Innovate UK £276,800 Feb. 1, 2017 Jan. 31, 2018 Closed 19 A SelFrag facility to underpin UK geoscience NERC £600,000 Aug. 31, 2020 March 30, 2021 Closed 20 Hetergeneous Catalysis - Green Methanol Synthesis EPSRC £0 Sept. 30, 2016 June 29, 2020 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »