Home Projects More like: Maximising Efficiency of Resource Usage Under Uncertainty in AI Planning [Clear] # Title Funder Funding Start End Status 61 Transformation of the Top and Tail of Energy Networks EPSRC £8,264,142 Sept. 30, 2011 Sept. 29, 2015 Closed 62 Transformation of the Top and Tail of Energy Networks EPSRC £20,660,355 Sept. 30, 2011 Sept. 30, 2015 Closed 63 S^3 Disease Surveillance for Structures and Systems EPSRC £1,782,330 March 31, 2013 March 29, 2018 Closed 64 S^3 Disease Surveillance for Structures and Systems EPSRC £4,455,825 March 31, 2013 March 30, 2018 Closed 65 PHASED DELIVERY OF ACTIVE INGREDIENTS FOR LOW TEMPERATURE CLEANING EPSRC £449,206 April 25, 2010 Nov. 16, 2012 Closed 66 PHASED DELIVERY OF ACTIVE INGREDIENTS FOR LOW TEMPERATURE CLEANING EPSRC £1,123,015 April 25, 2010 Nov. 16, 2012 Closed 67 Physics of Ignition: Collaboration with the National Ignition Facility: Diagnosing Hot-Spot Mix via X-Ray Spectroscopy EPSRC £938,074 Aug. 31, 2013 Aug. 30, 2017 Closed 68 MULTI-FUNCTIONAL POLYMER SCAFFOLDS FOR CLEANING CATALYSIS EPSRC £465,618 June 13, 2010 Dec. 13, 2012 Closed 69 MULTI-FUNCTIONAL POLYMER SCAFFOLDS FOR CLEANING CATALYSIS EPSRC £1,164,045 June 13, 2010 Dec. 13, 2012 Closed 70 Multilevel Monte Carlo Methods for Elliptic Problems with Applications to Radioactive Waste Disposal EPSRC £524,644 June 30, 2011 June 29, 2014 Closed 71 Multilevel Monte Carlo Methods for Elliptic Problems with Applications to Radioactive Waste Disposal EPSRC £1,311,610 June 30, 2011 June 30, 2014 Closed 72 Resilient Electricity Networks for a productive Grid Architecture (RENGA) EPSRC £1,968,296 April 30, 2018 April 29, 2022 Closed 73 Resilient Electricity Networks for a productive Grid Architecture (RENGA) GCRF £4,920,740 April 30, 2018 April 30, 2022 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 »