# Title Funder Funding Start End Status
1 NSF: Templated Ordered Endohedral Fullerenes as Building Blocks for Quantum Computing EPSRC
£1,484,496
June 30, 2008 Dec. 31, 2011 Closed
2 NSF: Templated Ordered Endohedral Fullerenes as Building Blocks for Quantum Computing EPSRC
£3,711,240
June 30, 2008 Dec. 31, 2011 Closed
3 Quadron-polariton: a new semiconductor quasiparticle EPSRC
£894,442
Jan. 1, 2008 June 29, 2011 Closed
4 Frustration: more ways to emergent behaviour. EPSRC
£179,142
May 31, 2014 Nov. 30, 2016 Closed
5 Frustration: more ways to emergent behaviour. EPSRC
£447,855
May 31, 2014 Nov. 30, 2016 Closed
6 Non-equilibrium quantum matter EPSRC
£1,515,212
Sept. 30, 2014 June 8, 2016 Closed
7 Non-equilibrium quantum matter EPSRC
£1,065,482
July 31, 2016 Oct. 31, 2019 Closed
8 Spintronics at Leeds: Platform Grant EPSRC
£2,566,914
Sept. 30, 2008 March 30, 2014 Closed
9 Polariton simulators EPSRC
£0
June 5, 2016 Nov. 30, 2019 Closed
10 Polariton simulators EPSRC
£0
June 5, 2016 Nov. 30, 2019 Closed
11 Quantum fluctuations during cosmic inflation STFC
£0
Sept. 30, 2018 Sept. 29, 2022 Active
12 Quantum fluctuations during cosmic inflation STFC
£0
Sept. 30, 2018 Sept. 30, 2022 Closed
13 Flat Band Phase Transition in Gadolinium Gallium Garnet EPSRC
£0
Sept. 30, 2019 March 31, 2023 Closed
14 New Quantum Materials from High Pressure Synthesis EPSRC
£1,493,992
Jan. 16, 2022 Jan. 15, 2026 Active
15 Beyond Luttinger Liquids-spin-charge separation at high excitation energies EPSRC
£713,972
Oct. 14, 2012 April 13, 2015 Closed
16 Beyond Luttinger Liquids-spin-charge separation at high excitation energies EPSRC
£437,090
Oct. 31, 2012 April 29, 2015 Closed
17 Emergence of novel electronic states in 5d transition metal oxides EPSRC
£969,734
Sept. 23, 2012 March 23, 2016 Closed
18 Emergence of novel electronic states in 5d transition metal oxides EPSRC
£862,996
Aug. 31, 2012 Feb. 29, 2016 Closed
19 Emergence of novel electronic states in 5d transition metal oxides EPSRC
£2,157,490
Aug. 31, 2012 Feb. 29, 2016 Closed
20 Externally-Shunted High-Gap Josephson Junctions: Design, Fabrication and Noise Measurements EPSRC
£398,178
June 15, 2006 June 14, 2009 Closed
Reset