# Title Funder Funding Start End Status
41 Six Axis Monitoring (SAM) local position reference system for dynamic positioning for safer offshore wind installation, servicing and maintenance operations. Innovate UK
£491,992
Sept. 30, 2020 March 30, 2022 Closed
42 Increasing the Life of Marine Turbines by Design and Innovation EPSRC
£1,148,100
April 30, 2012 Oct. 31, 2015 Closed
43 Offshore wind on-turbine electrical vessel charging system Innovate UK
£4,013,582
Aug. 31, 2021 March 30, 2022 Closed
44 Offshore wind on-turbine electrical vessel charging system Innovate UK
£10,033,955
Aug. 31, 2021 March 31, 2022 Closed
45 Advanced Non-Destructive Testing of Blade Manufacturing Defects EPSRC, NERC
£0
Sept. 30, 2018 Dec. 31, 2022 Closed
46 Integrated wind-wave control of semi-submersible floating offshore wind turbine platforms (FOWT-Control) EPSRC
£1,922,605
June 30, 2023 June 30, 2026 Active
47 Modelling Gas Turbine Blade Degradation in a High Fidelity Digital Twin EPSRC
£0
June 7, 2020 June 6, 2024 Active
48 Wind blade design for disassembly EPSRC
£0
Sept. 30, 2021 Sept. 30, 2025 Active
49 Wind blade design for disassembly EPSRC
£0
Sept. 19, 2021 Sept. 29, 2025 Active
50 Validation of robotic inspection and maintenance of offshore wind turbine blades Innovate UK
£336,602
March 31, 2021 Sept. 29, 2021 Closed
51 Validation of robotic inspection and maintenance of offshore wind turbine blades ISCF
£841,505
March 31, 2021 Sept. 30, 2021 Closed
52 Autonomous, robotic and AI enabled biofouling monitoring, cleaning and management system for offshore wind turbine monopile foundations (RobFMS) Innovate UK
£1,523,990
March 1, 2019 May 30, 2021 Closed
53 Autonomous, robotic and AI enabled biofouling monitoring, cleaning and management system for offshore wind turbine monopile foundations (RobFMS) ISCF
£3,809,975
March 1, 2019 May 31, 2021 Closed
54 Blade Integrated Optics For Offshore Wind LIDAR (BIOFOWL) Innovate UK
£455,094
March 1, 2017 Feb. 28, 2018 Closed
55 Data-driven Optimisation of Offshore Wind Operations & Maintenance EPSRC
£0
Aug. 31, 2021 Aug. 31, 2025 Active
56 High performance pultrusion for advanced composites (HIPPAC) Innovate UK
£590,322
Feb. 1, 2020 June 29, 2021 Closed
57 High performance pultrusion for advanced composites (HIPPAC) Innovate UK
£1,475,805
Feb. 1, 2020 June 30, 2021 Closed
58 Servo-aeroelastic tailoring of wind turbines using new active-to-passive control systems EPSRC
£1,099,078
Jan. 1, 2016 June 29, 2019 Closed
59 Servo-aeroelastic tailoring of wind turbines using new active-to-passive control systems EPSRC
£2,747,695
Jan. 1, 2016 June 30, 2019 Closed
60 Flow control to mitigate fatigue load through the use of flexible tidal turbine blades EPSRC
£192,096
Sept. 30, 2014 June 29, 2015 Closed
Reset