# Title Funder Funding Start End Status
1 SolDAC Full spectrum solar direct air capture and conversion Horizon Europe Guarantee
£1,251,670
Aug. 31, 2022 Aug. 31, 2025 Active
2 Multimetallic CO2 Reduction Catalysts as Artificial Cofactors EPSRC
£661,284
Dec. 1, 2023 Nov. 30, 2025 Active
3 Carbon negative chemicals synthesis directly from the air EPSRC
£1,280,340
Sept. 30, 2022 Sept. 30, 2024 Active
4 Carbon negative chemicals synthesis directly from the air EPSRC
£256,068
Sept. 30, 2022 Sept. 29, 2024 Active
5 Machine learning for modelling and control of direct air capture systems NERC
£10,907
Aug. 31, 2022 Aug. 30, 2023 Active
6 Machine learning for modelling and control of direct air capture systems NERC
£54,535
Aug. 31, 2022 Aug. 31, 2023 Closed
7 Engineering synthetic pathways to bio-ethylene production in Cupriavidus necator BBSRC
£0
Sept. 30, 2016 March 25, 2021 Closed
8 Commercial Demonstration Plant to Manufacture Synthetic Hydrocarbon Fuels from Renewable Power ("eFuels"): Phase-1A-Extended (Technology and Design - Catalyst Optimisation) Innovate UK
£126,376
Jan. 1, 2021 March 30, 2021 Closed
9 FarmQUBE Innovate UK
£94,474
Feb. 1, 2013 May 30, 2013 Closed
10 FarmQUBE Innovate UK
£236,185
Feb. 1, 2013 May 31, 2013 Closed
11 Nano-Integration of Metal-Organic Frameworks and Catalysis for the Uptake and Utilisation of CO2 EPSRC
£5,937,135
April 30, 2010 Feb. 14, 2014 Closed
12 Nano-Integration of Metal-Organic Frameworks and Catalysis for the Uptake and Utilisation of CO2 EPSRC
£2,374,854
April 30, 2010 Feb. 14, 2014 Closed
13 NREL Partnership: Engineering synthetic RNA devices to expediate the evolution of metabolite producing micro-organisms BBSRC
£0
Sept. 30, 2015 Aug. 24, 2020 Closed
14 Feasibility study of growth by MBE of As doped GaN layers for photoanode applications in hydrogen production by photoelectrochemical water splitting EPSRC
£87,490
Aug. 31, 2008 Aug. 30, 2009 Closed
15 Feasibility study of growth by MBE of As doped GaN layers for photoanode applications in hydrogen production by photoelectrochemical water splitting EPSRC
£218,725
Aug. 31, 2008 Aug. 31, 2009 Closed
16 Investigation of thermo-mechanical performance of PCM incorporated Geothermal Energy Pile (PCMinGEEP) EPSRC
£428,708
Nov. 1, 2019 Oct. 31, 2022 Active
17 Investigation of thermo-mechanical performance of PCM incorporated Geothermal Energy Pile (PCMinGEEP) EPSRC
£1,071,770
Nov. 1, 2019 Oct. 31, 2022 Closed
18 Power to Liquids Research Facility EPSRC
£8,872,785
Jan. 3, 2023 Jan. 2, 2027 Active
19 Optimization of Thermally Driven Building Cooling Systems EPSRC
£0
Sept. 30, 2019 Sept. 29, 2023 Active
20 Optimization of Thermally Driven Building Cooling Systems EPSRC
£0
Sept. 30, 2019 Dec. 31, 2023 Closed
Reset