# Title Funder Funding Start End Status
21 Boiling in Microchannels: integrated design of closed-loop cooling system for devices operating at high heat fluxes EPSRC
£2,095,660
April 30, 2013 Oct. 30, 2016 Closed
22 Ultra-High Temperature Thermal Energy Storage Investigating the fluid dynamics and heat transfer aspect of the ultra-high temperature thermal energy EPSRC
£0
Jan. 1, 2018 March 30, 2022 Active
23 Ultra-High Temperature Thermal Energy Storage Investigating the fluid dynamics and heat transfer aspect of the ultra-high temperature thermal energy EPSRC, NERC
£0
Jan. 1, 2018 March 31, 2022 Closed
24 Nanocoating improvements for Hydrogen Generation Innovate UK
£15,648
Jan. 1, 2022 March 30, 2022 Closed
25 Integrated Waste Heat Driven CHP-Moist Airflow / Energy Storage System Innovate UK
£64,374
May 31, 2015 Aug. 30, 2015 Closed
26 Laser-driven multi-modal probe beams for nuclear waste inspection STFC
£760,840
Sept. 30, 2016 March 31, 2020 Closed
27 Laser-driven multi-modal probe beams for nuclear waste inspection STFC
£202,295
Sept. 30, 2016 Sept. 30, 2019 Closed
28 IMPULSE - Advanced Industrial Manufacture of Next-Generation MARBN Steel for Cleaner Fossil Plant EPSRC
£171,634
Feb. 1, 2016 Jan. 31, 2019 Closed
29 Additively manufactured heat exchangers for ultra-high bypass ratio turbofans Innovate UK
£175,000
June 30, 2020 Oct. 30, 2021 Closed
30 Thin film solid electrolyte batteries EPSRC
£0
Sept. 30, 2018 Sept. 29, 2022 Active
31 Polymer Mirco-Hollow Fibre Heat Exchangers Innovate UK
£1,939,514
March 31, 2015 March 30, 2018 Closed
32 An experimental investigation into combined film and internal cooling of turbine blades EPSRC
£0
Sept. 30, 2018 Sept. 29, 2022 Active
33 DIMENSIONALLY STABLE ELECTRODES FOR SUPERCRITICAL WATER ELECTROLYSIS (SuperH2) EPSRC
£252,097
July 24, 2022 Jan. 24, 2024 Active
34 DIMENSIONALLY STABLE ELECTRODES FOR SUPERCRITICAL WATER ELECTROLYSIS (SuperH2) EPSRC
£1,260,485
July 24, 2022 Jan. 24, 2024 Active
35 Mitigation potential of horizontal Ground Coupled Heat Pumps for current and future climatic conditions: UK environmental modelling studies NERC
£679,558
April 30, 2009 Nov. 30, 2012 Closed
36 Mitigation potential of horizontal Ground Coupled Heat Pumps for current and future climatic conditions: UK environmental modelling studies NERC
£133,878
April 30, 2009 Nov. 30, 2012 Closed
37 Mitigation potential of horizontal Ground Coupled Heat Pumps for current and future climatic conditions: UK environmental modelling studies NERC
£439,862
Jan. 1, 2009 Oct. 31, 2012 Closed
38 Mitigation potential of horizontal Ground Coupled Heat Pumps for current and future climatic conditions: UK environmental modelling studies NERC
£1,698,895
April 30, 2009 Nov. 30, 2012 Closed
39 Mitigation potential of horizontal Ground Coupled Heat Pumps for current and future climatic conditions: UK environmental modelling studies NERC
£1,099,655
Jan. 1, 2009 Oct. 31, 2012 Closed
40 Mitigation potential of horizontal Ground Coupled Heat Pumps for current and future climatic conditions: UK environmental modelling studies NERC
£334,695
April 30, 2009 Nov. 30, 2012 Closed