# Title Funder Funding Start End Status
81 Irradiance Forecasting through Analysis of Sky Images EPSRC
£0
Sept. 30, 2019 Sept. 29, 2022 Active
82 Accurate Time and radio signal distribution through Optical access networks to enable sub-Metre positioning accuracy (ATOM) Innovate UK
£192,867
Nov. 1, 2022 Oct. 31, 2023 Active
83 Accurate Time and radio signal distribution through Optical access networks to enable sub-Metre positioning accuracy (ATOM) Innovate UK
£964,335
Nov. 1, 2022 Jan. 31, 2024 Active
84 Meteorites as free sample-returns: Operation of the UK Desert Fireball Network STFC
£601,238
Sept. 27, 2008 Sept. 26, 2011 Closed
85 Meteorites as free sample-returns: Operation of the UK Desert Fireball Network STFC
£1,503,095
Sept. 27, 2008 Sept. 27, 2011 Closed
86 Prototype carbon footprint calculator tools Innovate UK
£135,076
Nov. 1, 2021 March 30, 2022 Closed
87 Spatially Embedded Networks EPSRC
£1,250,434
Oct. 5, 2015 Dec. 31, 2018 Closed
88 Spatially Embedded Networks EPSRC
£1,147,166
Nov. 1, 2015 March 18, 2019 Closed
89 Spatially Embedded Networks EPSRC
£3,126,085
Oct. 5, 2015 Dec. 31, 2018 Closed
90 Next Generation Materials Chemistry EPSRC
£0
Sept. 30, 2019 June 29, 2023 Active
91 Active Tape Matrix Fast Start Innovation. Innovate UK
£49,957
Nov. 1, 2022 March 30, 2023 Active
92 Novel manufacturing approaches to smarter Na-ion cathodes EPSRC
£0
Sept. 30, 2022 Sept. 29, 2026 Active
93 Prospecting for Micro Hydropower Sites On African Rivers From Satellite Innovate UK
£1,230,720
June 30, 2017 June 30, 2019 Closed
94 A realist evaluation on SMEs in sustainable tourism: how can the socialization of learning re-shape ESRC
£0
Sept. 29, 2019 Dec. 31, 2023 Active
95 Feasibility Study to explore manufacturing Treekind with Uniroyal Global (continuous production) and Veshin Factory (leather goods production) Innovate UK
£41,294
Jan. 1, 2022 March 30, 2022 Active
96 Discovering a Sustainable Power Solution for Next Generation 5G Railway Communication EPSRC
£202,434
Sept. 30, 2022 Sept. 29, 2024 Active
97 Discovering a Sustainable Power Solution for Next Generation 5G Railway Communication EPSRC
£1,012,170
March 31, 2023 March 31, 2025 Active
98 Large Volume, Multi-material High Speed Sintering Machine EPSRC
£1,784,450
March 31, 2015 Sept. 29, 2017 Closed
99 Large Volume, Multi-material High Speed Sintering Machine EPSRC
£4,461,125
March 31, 2015 Sept. 30, 2017 Closed
100 Lowering the Energy Demand and Broadening the Scope of Renewable Polymer Manufacture EPSRC
£597,288
April 20, 2015 Jan. 31, 2017 Closed
Reset