Home Projects More like: Continuous Measurement of Liquid Steel Temperature and Chemistry [Clear] # Title Funder Funding Start End Status 61 Using human-like creative computing (AI) to assist in geological interpretation NERC £0 Sept. 30, 2018 March 30, 2023 Closed 62 Decarbonising the Production of Large Scale Forgings and Castings Innovate UK £169,272 June 30, 2021 Aug. 30, 2022 Active 63 Decarbonising the Production of Large Scale Forgings and Castings Innovate UK £423,180 June 30, 2021 Aug. 31, 2022 Closed 64 Step change material efficiency for steel and aluminium. EPSRC £3,130,892 Jan. 1, 2009 July 30, 2014 Closed 65 Step change material efficiency for steel and aluminium. EPSRC £7,827,230 Jan. 1, 2009 July 31, 2014 Closed 66 IN-SITU CATALYTIC UPGRADING OF HEAVY CRUDE AND BITUMEN: OPTIMISATION OF NOVEL CAPRI REACTOR EPSRC £625,446 March 17, 2008 July 15, 2011 Closed 67 IN-SITU CATALYTIC UPGRADING OF HEAVY CRUDE AND BITUMEN: OPTIMISATION OF NOVEL CAPRI REACTOR EPSRC £1,563,615 March 17, 2008 July 16, 2011 Closed 68 IN-SITU CATALYTIC UPGRADING OF HEAVY CRUDE AND BITUMEN: OPTIMISATION OF NOVEL CAPRI REACTOR EPSRC £845,452 Nov. 1, 2007 Oct. 30, 2010 Closed 69 IN-SITU CATALYTIC UPGRADING OF HEAVY CRUDE AND BITUMEN: OPTIMISATION OF NOVEL CAPRI REACTOR EPSRC £2,113,630 Nov. 1, 2007 Oct. 31, 2010 Closed 70 ENVIRO-COAT: ENVIROnmentally assisted, engineered Corrosion prOducts for Aqueous corrosion miTigation EPSRC £1,733,840 March 31, 2020 March 31, 2023 Closed 71 The cosmic evolution of Supermassive Black holes: A panchromatic study of the nuclear environment STFC £0 Sept. 30, 2022 Sept. 30, 2026 Active 72 Optimising Plasma Sprayed Tungsten Coatings EPSRC, NERC £0 Sept. 30, 2018 March 31, 2023 Closed 73 Pre-commercial technology validation of a clean cold renewable syngas production plant. EPSRC £162,492 May 31, 2016 May 30, 2017 Closed 74 Contact Mechanics and Material Removal in Abradable Linings EPSRC £201,150 Nov. 15, 2010 Nov. 14, 2011 Closed 75 Briquetting of recycled glass fines for energy and CO2 reduction in the glass industry EPSRC £192,906 Sept. 30, 2016 Sept. 29, 2017 Closed 76 Briquetting of recycled glass fines for energy and CO2 reduction in the glass industry EPSRC £482,265 Sept. 30, 2016 Sept. 30, 2017 Closed 77 Autonomous Inspection for Responsive and Sustainable Nuclear Fuel Manufacture (AIRS-NFM) EPSRC £2,998,732 Sept. 5, 2021 Sept. 4, 2024 Active 78 Autonomous Inspection for Responsive and Sustainable Nuclear Fuel Manufacture (AIRS-NFM) EPSRC £7,496,830 Sept. 5, 2021 June 5, 2025 Closed 79 A Safe and Efficient, Low-Cost, High-Pressure Metal Hydride, Hydrogen Storage Solution. Innovate UK £812,924 Aug. 31, 2022 Aug. 30, 2024 Active 80 A Safe and Efficient, Low-Cost, High-Pressure Metal Hydride, Hydrogen Storage Solution. Innovate UK £4,064,620 Aug. 31, 2022 Aug. 31, 2024 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »