Home Projects More like: Flow control to mitigate fatigue load through the use of flexible tidal turbine blades [Clear] # Title Funder Funding Start End Status 1 Morphing-Blades: New-Concept Turbine Blades for Unsteady Load Mitigation EPSRC £1,819,700 June 30, 2021 June 29, 2024 Active 2 Morphing-Blades: New-Concept Turbine Blades for Unsteady Load Mitigation EPSRC £4,549,250 June 30, 2021 June 30, 2024 Active 3 Fatigue Effects in Composite Tidal Turbine Blades caused by Discrete Point Loading during Service EPSRC £0 Sept. 30, 2021 Sept. 29, 2025 Active 4 Integrating with Renewable Energy sources: Low Pressure Steam Turbine Last Stage Blade Durability EPSRC £0 Sept. 25, 2019 March 30, 2023 Active 5 Integrating with Renewable Energy sources: Low Pressure Steam Turbine Last Stage Blade Durability EPSRC £0 Sept. 30, 2019 March 31, 2023 Closed 6 Increasing the Life of Marine Turbines by Design and Innovation EPSRC £1,148,100 April 30, 2012 Oct. 31, 2015 Closed 7 Establishing the performance implications of employing lower cost methods for the manufacture of large scale tidal turbine rotors (EPICTidal) EPSRC £157,488 April 30, 2017 April 29, 2018 Closed 8 Servo-aeroelastic tailoring of wind turbines using new active-to-passive control systems EPSRC £1,099,078 Jan. 1, 2016 June 29, 2019 Closed 9 Servo-aeroelastic tailoring of wind turbines using new active-to-passive control systems EPSRC £2,747,695 Jan. 1, 2016 June 30, 2019 Closed 10 Effects of turbulent flow conditions on performance of wind and tidal turbines EPSRC £0 Jan. 1, 2018 June 29, 2021 Closed 11 Effects of turbulent flow conditions on performance of wind and tidal turbines EPSRC £0 Jan. 1, 2018 June 30, 2021 Closed 12 Development of in situ repair of damaged wind turbine blades Innovate UK £241,392 May 31, 2010 Nov. 30, 2011 Closed 13 Development of in situ repair of damaged wind turbine blades Innovate UK £603,480 May 31, 2010 Nov. 30, 2011 Closed 14 Improved materials for energy generation through advanced tidal device technology design (TidalDesign) Innovate UK £460,570 Sept. 30, 2010 March 31, 2013 Closed 15 Improved materials for energy generation through advanced tidal device technology design (TidalDesign) Innovate UK £1,151,425 Sept. 30, 2010 March 31, 2013 Closed 16 Impacts of Atmospheric Turbulence on Wind Turbine Main-Bearing Function and Failures EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 17 Impacts of Atmospheric Turbulence on Wind Turbine Main-Bearing Function and Failures EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 18 FloWTurb: Response of Tidal Energy Converters to Combined Tidal Flow, Waves, and Turbulence EPSRC £1,491,084 April 12, 2016 Oct. 31, 2019 Closed 19 Structural Composites Research Facility (SCRF) EPSRC £2,799,560 May 31, 2017 Nov. 30, 2020 Closed 20 Structural Composites Research Facility (SCRF) EPSRC £6,998,900 May 31, 2017 Nov. 30, 2020 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »