Home Projects More like: Bio-fabrication of sustainable functional bacterial cellulose aerogel for building insulation [Clear] # Title Funder Funding Start End Status 41 An extremely thermally efficient and airtight curtain walling system for building refurbishment Innovate UK £40,000 March 1, 2013 April 29, 2013 Closed 42 An extremely thermally efficient and airtight curtain walling system for building refurbishment Innovate UK £100,000 March 1, 2013 April 30, 2013 Closed 43 Anisotropic nanostructured materials based on graphene and 2D materials EPSRC £0 Jan. 1, 2017 March 30, 2017 Closed 44 Anisotropic nanostructured materials based on graphene and 2D materials EPSRC £0 Jan. 1, 2017 March 31, 2017 Closed 45 Thermulon – non-combustible high performance building insulation Innovate UK £676,074 Nov. 1, 2020 Dec. 31, 2021 Closed 46 A Novel Thermoelectric Heat Pump/Heat Recovery System for Low Carbon Buildings (EcoPump) Innovate UK £788,382 March 1, 2018 Feb. 29, 2020 Closed 47 A Novel Thermoelectric Heat Pump/Heat Recovery System for Low Carbon Buildings (EcoPump) Innovate UK £1,970,955 March 1, 2018 Feb. 29, 2020 Closed 48 Active-LIVing Envelopes (ALIVE) EPSRC £200,552 March 31, 2016 Nov. 30, 2017 Closed 49 Active-LIVing Envelopes (ALIVE) EPSRC £501,380 March 31, 2016 Nov. 30, 2017 Closed 50 Tri-Form UK Innovate UK £10,000 Nov. 1, 2012 March 31, 2013 Closed 51 3D Nanocarbon Assemblies as Templates for the Controlled Formation of Functional Gold and Copper Aerogels EPSRC £0 Sept. 30, 2016 Sept. 29, 2020 Closed 52 Controlling Microstructure of Metal and Polymer Aerogels via Advanced Templating Approaches EPSRC £0 Sept. 30, 2020 March 31, 2024 Active 53 Diagnostic Net-Zero Carbon Refurbishment and Supply Chains Procurement Tool (Carbon Diagnostics) Innovate UK £119,600 Sept. 30, 2020 Dec. 31, 2020 Closed 54 Eco-Energy Retrofit, Grove Housing Association, Belfast Innovate UK £300,000 March 1, 2010 March 31, 2013 Closed 55 Eco-Energy Retrofit, Grove Housing Association, Belfast Innovate UK £750,000 March 1, 2010 March 31, 2013 Closed 56 Carbon foam to store hydrogen in the aim to achieve net zero carbon energy systems EPSRC £0 Sept. 30, 2022 Sept. 29, 2026 Active 57 Electrochemical High-Throughput Discovery of Novel Lytic Polysaccharide Monooxygenase Enzymes BBSRC £0 Sept. 30, 2022 Sept. 29, 2026 Active 58 Electrochemical High-Throughput Discovery of Novel Lytic Polysaccharide Monooxygenase Enzymes BBSRC £0 Sept. 30, 2022 Sept. 30, 2026 Active 59 Advanced lightweight materials for Energy-efficient Structures. Horizon Europe Guarantee £1,234,105 Dec. 1, 2022 May 31, 2026 Active 60 Advanced lightweight materials FOR Energy-efficient STructures Horizon Europe Guarantee £1,530,375 Dec. 1, 2022 May 31, 2026 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »