Home Projects More like: From conformal loop ensembles to conformal field theory [Clear] # Title Funder Funding Start End Status 61 Workshop on "Avalanches in Functional Materials" (AFM) EPSRC £46,268 Nov. 14, 2014 April 12, 2015 Closed 62 Workshop on "Avalanches in Functional Materials" (AFM) EPSRC £115,670 Nov. 14, 2014 April 13, 2015 Closed 63 Passive vibration control of a floating hydrostatic transmission wind turbine and theoretical extensions EPSRC £202,124 May 31, 2018 June 29, 2020 Closed 64 Passive vibration control of a floating hydrostatic transmission wind turbine and theoretical extensions EPSRC £505,310 May 31, 2018 June 30, 2020 Closed 65 Multivariate Max-stable Processes with Application to the Forecasting of Multiple Hazards EPSRC £878,108 June 28, 2018 Aug. 30, 2021 Closed 66 Multivariate Max-stable Processes with Application to the Forecasting of Multiple Hazards EPSRC £85,630 Aug. 31, 2021 July 30, 2022 Closed 67 Systems analysis of guard cell oscillatory mechanics in stomatal dynamics BBSRC £420,798 Sept. 30, 2008 Sept. 29, 2010 Closed 68 Systems analysis of guard cell oscillatory mechanics in stomatal dynamics BBSRC £816,898 March 15, 2008 March 14, 2011 Closed 69 A first principles study of electric double layer capacitors EPSRC £194,772 Sept. 30, 2015 March 30, 2017 Closed 70 A first principles study of electric double layer capacitors EPSRC £486,930 Sept. 30, 2015 March 31, 2017 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 »