Home Projects More like: BEVScanV2X [Clear] # Title Funder Funding Start End Status 1 ENSTOREL-V2X - Mobile, Bidirectional EV Charging. Innovate UK £1,096,665 Aug. 31, 2022 Aug. 31, 2023 Closed 2 Battery Characterisation and Management - the key to Smart Grids and the Integration of Electric Vehicles EPSRC £2,677,438 July 10, 2013 April 27, 2017 Closed 3 Battery Characterisation and Management - the key to Smart Grids and the Integration of Electric Vehicles EPSRC £6,693,595 July 10, 2013 April 28, 2017 Closed 4 Zero Carbon Tariffs with Cashback for V2X enabled Non-domestic Customers Innovate UK £701,325 Aug. 31, 2022 Aug. 31, 2023 Closed 5 CCS V2x Innovate UK £694,052 Sept. 30, 2020 March 30, 2021 Closed 6 CCS V2x Innovate UK £1,735,130 Sept. 30, 2020 March 31, 2021 Closed 7 Bi-directional MIMO DC/DC Converter for V2G/X Infrastructures Innovate UK £1,149,800 Aug. 31, 2022 Aug. 31, 2023 Closed 8 Electric Fleets with On-site Renewable Energy Sources (EFORES): Data-driven Dynamic Dispatching and Charging under Uncertainties EPSRC £100,764 Dec. 1, 2021 Jan. 31, 2023 Active 9 Electric Fleets with On-site Renewable Energy Sources (EFORES): Data-driven Dynamic Dispatching and Charging under Uncertainties EPSRC £251,910 Feb. 1, 2022 Jan. 31, 2023 Closed 10 BADGE - BAttery Degradation for Grid-connected Electric vehicles Innovate UK £727,815 March 31, 2018 March 31, 2019 Closed 11 Next Generation V2X Power Module Innovate UK £935,670 Aug. 31, 2022 Aug. 31, 2023 Closed 12 VehIcle-to-Grid Intelligent controL (VIGIL) Innovate UK £1,398,896 March 1, 2018 Feb. 29, 2020 Closed 13 VehIcle-to-Grid Intelligent controL (VIGIL) Innovate UK £3,497,240 March 1, 2018 Feb. 29, 2020 Closed 14 ABOVE (Applying Battery Optimised Vehicle charging Environments). Innovate UK £276,986 Sept. 30, 2020 March 30, 2021 Closed 15 ABOVE (Applying Battery Optimised Vehicle charging Environments). Innovate UK £692,465 Sept. 30, 2020 March 31, 2021 Closed 16 Future Transport Systems - Vehicle to Grid opportunity study Innovate UK £30,000 Feb. 1, 2014 April 29, 2014 Closed 17 Future Transport Systems - Vehicle to Grid opportunity study Innovate UK £75,000 Feb. 1, 2014 April 30, 2014 Closed 18 AC charging with EV metadata and State-of-Charge (ACES): for truly smart charging and V2G Innovate UK £160,118 Sept. 30, 2020 March 30, 2021 Closed 19 AC charging with EV metadata and State-of-Charge (ACES): for truly smart charging and V2G Innovate UK £400,295 Sept. 30, 2020 March 31, 2021 Closed 20 XL-Connect Large scale system approach for advanced charging solutions Horizon Europe Guarantee £521,660 Jan. 1, 2023 June 30, 2026 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »