# Title Funder Funding Start End Status
81 Passive vibration control of a floating hydrostatic transmission wind turbine and theoretical extensions EPSRC
£202,124
May 31, 2018 June 29, 2020 Closed
82 Passive vibration control of a floating hydrostatic transmission wind turbine and theoretical extensions EPSRC
£505,310
May 31, 2018 June 30, 2020 Closed
83 Complexes with Redox Non-Innocent Ligands for Flow Battery Energy Storage EPSRC
£199,340
Nov. 1, 2017 Dec. 31, 2018 Closed
84 Joint UK-India Clean Energy Centre (JUICE) EPSRC
£10,188,872
Sept. 30, 2016 March 30, 2022 Closed
85 Joint UK-India Clean Energy Centre (JUICE) Newton Fund
£25,472,180
Sept. 30, 2016 March 31, 2022 Closed
86 Design, build and testing of a 50 kVA SiC BJT inverter as a building block for high-power HVDC inverters EPSRC
£417,522
Aug. 31, 2014 May 30, 2016 Closed
87 Design, build and testing of a 50 kVA SiC BJT inverter as a building block for high-power HVDC inverters EPSRC
£104,080
Aug. 24, 2016 Nov. 24, 2016 Closed
88 Design, build and testing of a 50 kVA SiC BJT inverter as a building block for high-power HVDC inverters EPSRC
£1,043,805
Aug. 31, 2014 May 31, 2016 Closed
89 Design, build and testing of a 50 kVA SiC BJT inverter as a building block for high-power HVDC inverters EPSRC
£260,200
Aug. 24, 2016 Nov. 24, 2016 Closed
90 Silicon-Silicon Carbide (Si/SiC) Power Devices for high temperature, hostile environment applications EPSRC
£198,116
Dec. 1, 2015 May 30, 2018 Closed
91 Multi-Domain Virtual Prototyping Techniques for Wide-Bandgap Power Electronics EPSRC
£2,158,516
Nov. 24, 2017 Nov. 23, 2021 Closed
92 Multi-Domain Virtual Prototyping Techniques for Wide-Bandgap Power Electronics EPSRC
£5,396,290
Nov. 24, 2017 Nov. 23, 2021 Closed
93 Thermally-Aware Power Distribution Networks for Vertically Integrated Systems EPSRC
£1,002,546
March 31, 2015 Nov. 30, 2018 Closed
Reset