Home Projects More like: ALPACA: Axial-Lateral Pile Analysis for Chalk Applying multi-scale field and laboratory testing [Clear] # Title Funder Funding Start End Status 21 Resource Recovery and Remediation of Alkaline Wastes NERC £3,874,410 Aug. 30, 2014 March 31, 2019 Closed 22 Resource recovery and remediation of alkaline wastes NERC £1,565,895 Aug. 30, 2014 Feb. 28, 2018 Closed 23 Severe Storm Wave Loads on Offshore Wind Turbine Foundations (SEA-SWALLOWS) EPSRC £1,589,160 Sept. 30, 2021 Sept. 29, 2024 Active 24 Severe Storm Wave Loads on Offshore Wind Turbine Foundations (SEA-SWALLOWS) EPSRC £3,972,900 Sept. 30, 2021 Sept. 30, 2024 Active 25 Advanced Measurement, Modelling and Utilisation of Bouncing and Jumping Loading Induced by Groups and Crowds EPSRC £197,824 Nov. 1, 2013 May 31, 2015 Closed 26 FROTH: Fundamentals and Reliability of Offshore Structure Hydrodynamics EPSRC £2,180,560 Nov. 1, 2012 Oct. 31, 2015 Closed 27 Marine mussel plaque-inspired anchoring systems for offshore floating structures EPSRC £201,751 Nov. 1, 2022 Sept. 29, 2024 Active 28 Marine mussel plaque-inspired anchoring systems for offshore floating structures EPSRC £1,008,755 April 9, 2023 March 9, 2025 Active 29 Quarter Scale Testing of the Intelligent Mooring System for Floating Offshore Wind Platforms Innovate UK £819,868 April 30, 2021 Feb. 28, 2023 Active 30 Structural Composites Research Facility (SCRF) EPSRC £2,799,560 May 31, 2017 Nov. 30, 2020 Closed 31 Structural Composites Research Facility (SCRF) EPSRC £6,998,900 May 31, 2017 Nov. 30, 2020 Closed 32 Fatigue and damage tolerance of 3D-woven composites EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 33 Dislocation-Microstructure Interaction at a Crack Tip - In Search of a Driving Force for Short Crack Growth EPSRC £803,262 Oct. 23, 2014 April 22, 2019 Closed 34 Mixed-Mode Fatigue Crack Studies EPSRC £35,130 April 4, 2010 Sept. 3, 2010 Closed 35 Autonomous Modelling Solutions for Operational Structural Dynamic Systems EPSRC £485,716 Sept. 30, 2021 March 31, 2024 Active 36 Extreme Loading on FOWT under Complex Environmental Conditions EPSRC £706,310 Oct. 14, 2019 June 29, 2023 Active 37 Extreme Loading on FOWT under Complex Environmental Conditions EPSRC £1,765,775 Oct. 14, 2019 Feb. 29, 2024 Active 38 Bionic Adaptive Stretchable Materials for WEC (BASM-WEC) EPSRC £4,952,605 Sept. 30, 2021 Jan. 31, 2025 Active 39 Virtual Wave Structure Interaction (WSI) Simulation Environment EPSRC £1,616,720 Oct. 31, 2013 March 31, 2017 Closed 40 EPSRC Centre for Doctoral Training in Renewable Energy Marine Structures (REMS) EPSRC £12,047,608 April 30, 2014 Dec. 31, 2022 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 »