# Title Funder Funding Start End Status
1 Enhanced Control and Operation of Doubly-Fed Induction Generator Based Wind Farm during Network Unbalance EPSRC
£123,862
Aug. 31, 2007 Sept. 29, 2008 Closed
2 Enhanced Control and Operation of Doubly-Fed Induction Generator Based Wind Farm during Network Unbalance EPSRC
£254,162
March 31, 2006 Aug. 30, 2007 Closed
3 Enhanced Control and Operation of Doubly-Fed Induction Generator Based Wind Farm during Network Unbalance EPSRC
£0
Aug. 31, 2007 Sept. 30, 2008 Closed
4 Control and operation of MVDC systems with grid forming capability for the future GB power system EPSRC
£0
Sept. 30, 2020 March 31, 2024 Active
5 Control and operation of MVDC systems with grid forming capability for the future GB power system EPSRC
£0
Sept. 30, 2020 Dec. 31, 2024 Active
6 IES: Equalising airgap radial forces in direct drive generators EPSRC
£0
Sept. 30, 2022 March 30, 2026 Active
7 Reliable and Efficient System for Community Energy Solution- RESCUES EPSRC
£1,910,184
Feb. 1, 2014 March 28, 2018 Closed
8 Reliable and Efficient System for Community Energy Solution- RESCUES EPSRC
£4,775,460
Feb. 1, 2014 March 29, 2018 Closed
9 Multilevel Inverter Topologies for MVDC EPSRC
£0
Dec. 1, 2017 May 30, 2021 Closed
10 Multilevel Inverter Topologies for MVDC EPSRC
£0
Dec. 1, 2017 May 31, 2021 Closed
11 Nonlinear Adaptive Control of Doubly-fed Induction Generator for Variable Speed Wind Turbine EPSRC
£361,552
Oct. 29, 2012 Oct. 28, 2014 Closed
12 Nonlinear Adaptive Control of Doubly-fed Induction Generator for Variable Speed Wind Turbine EPSRC
£903,880
Oct. 29, 2012 Oct. 28, 2014 Closed
13 Integration of wave and offshore wind energies EPSRC
£0
Sept. 30, 2022 Sept. 29, 2025 Active
14 Integration of wave and offshore wind energies EPSRC
£0
Sept. 30, 2021 Sept. 30, 2025 Active
15 Integration of Lithium Batteries to Improve Reliability and Power Density of WBG-based Medium Voltage Direct Current Converters EPSRC
£0
Sept. 30, 2020 Sept. 29, 2024 Active
16 Integration of Lithium Batteries to Improve Reliability and Power Density of WBG-based Medium Voltage Direct Current Converters EPSRC
£0
Sept. 30, 2020 Sept. 30, 2024 Active
17 Sustainable urban power supply through intelligent control and enhanced restoration of AC/DC networks EPSRC
£1,209,122
March 31, 2020 March 30, 2023 Active
18 Sustainable urban power supply through intelligent control and enhanced restoration of AC/DC networks EPSRC
£3,022,805
March 31, 2020 March 31, 2024 Active
19 Design Developement of an integration solution to utilise spare capacity in transport systems to provide local energy supplies in dense urban centres. Innovate UK
£96,138
July 31, 2020 Jan. 31, 2021 Closed
20 Design Developement of an integration solution to utilise spare capacity in transport systems to provide local energy supplies in dense urban centres. ISCF
£240,345
July 31, 2020 Jan. 31, 2021 Closed
Reset