Home Projects More like: The effect of purge-mainstream density ratio on turbine cavity flows. [Clear] # Title Funder Funding Start End Status 81 EPICTidal: Establishing the performance implications of employing lower cost methods for the manufacture of large scale tidal turbine rotors Innovate UK £139,902 March 31, 2017 March 30, 2018 Closed 82 Versatile Fluid Measurement System for Aerospace Research EPSRC £9,834 March 31, 2015 Sept. 30, 2020 Closed 83 WindSurf- A self-starting, active-pitch, vertical-axis wind turbine EPSRC £400,894 Oct. 2, 2016 Oct. 1, 2018 Closed 84 WindSurf- A self-starting, active-pitch, vertical-axis wind turbine EPSRC £1,002,235 Oct. 2, 2016 Oct. 2, 2018 Closed 85 Active wind farm control via morphing blade technology EPSRC £0 Sept. 30, 2022 Sept. 29, 2025 Active 86 Active wind farm control via morphing blade technology EPSRC £0 Sept. 30, 2022 Sept. 30, 2025 Active 87 Spectral Broadening in Aeroacoustics EPSRC £646,934 May 31, 2013 Nov. 30, 2016 Closed 88 Filtered Rayleigh scattering for multi-parameter fluid flow analysis EPSRC £832,986 March 1, 2009 Aug. 30, 2012 Closed 89 Active Control of Turbulent Flow Separation by Surface Plasma EPSRC £377,676 Jan. 1, 2006 Dec. 31, 2008 Closed 90 Wind turbine wake analysis and modelling EPSRC £0 Sept. 30, 2019 Sept. 29, 2023 Active 91 Tidal Turbine Blades - Maximising Reliability and Performance and Reducing Cost (BMAX) Innovate UK £1,109,806 Aug. 31, 2010 Nov. 30, 2013 Closed 92 Tidal Turbine Blades - Maximising Reliability and Performance and Reducing Cost (BMAX) Innovate UK £2,774,515 Aug. 31, 2010 Nov. 30, 2013 Closed 93 Optimal fuel blends for ammonia fuelled thermal propulsion systems EPSRC £409,408 Feb. 1, 2021 Jan. 31, 2023 Active 94 Optimal fuel blends for ammonia fuelled thermal propulsion systems EPSRC £1,023,520 Feb. 1, 2021 Sept. 30, 2023 Closed 95 Closed Loop Flow Control for Aeroengines EPSRC £0 Sept. 30, 2019 Sept. 29, 2023 Active 96 Next-generation materials for turbine engines: Environmental and mechanical performance of a metallic ultra-high temperature materials system EPSRC £0 Sept. 25, 2022 March 30, 2026 Active 97 Unsteady flow effects on film cooling in low-emissions gas turbine combustors EPSRC £424,334 Sept. 30, 2007 Sept. 29, 2011 Closed 98 Computational Modelling and Optimisation of Carbon Capture Reactors EPSRC £2,904,795 Jan. 30, 2013 Sept. 11, 2015 Closed 99 Computational Modelling and Optimisation of Carbon Capture Reactors EPSRC £1,135,455 Sept. 11, 2015 Nov. 11, 2017 Closed 100 AIM (Advanced Instability Methods) for industry EPSRC £675,904 Jan. 1, 2011 June 29, 2014 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »