Home Projects More like: WakeBlaster - faster than real-time wind farm flow simulation for optimised operational control [Clear] # Title Funder Funding Start End Status 41 Monitoring and forecasting avian collision risk at an operational offshore wind farm NERC £638,160 Jan. 1, 2018 March 31, 2020 Closed 42 EchoBoltBUG ISCF £1,455,445 March 31, 2021 March 31, 2022 Closed 43 Developing Offshore Floating Technology EPSRC £0 Aug. 31, 2022 Aug. 31, 2026 Active 44 Wind-AI: Wind Turbine Performance modelling utilising Deep Learning with LIDAR Validation Innovate UK £644,332 March 31, 2020 June 29, 2021 Closed 45 Wind-AI: Wind Turbine Performance modelling utilising Deep Learning with LIDAR Validation Innovate UK £1,610,830 March 31, 2020 June 30, 2021 Closed 46 Productizing Microfluidic Technology for Real-time Lubricating Oil Analysis on Wind Turbines Innovate UK £245,740 June 30, 2018 Dec. 31, 2019 Closed 47 Productizing Microfluidic Technology for Real-time Lubricating Oil Analysis on Wind Turbines Innovate UK £614,350 June 30, 2018 Dec. 31, 2019 Closed 48 UNderwater IntervenTion for offshore renewable Energies (UNITE) EPSRC £5,817,620 March 1, 2023 Aug. 31, 2026 Active 49 Integration of Wind Power Generation with Compressed Air Energy Storage 1=Energy 2=Wind Power EPSRC £0 Sept. 30, 2018 June 29, 2022 Active 50 Integration of Wind Power Generation with Compressed Air Energy Storage 1=Energy 2=Wind Power EPSRC, NERC £0 Sept. 30, 2018 June 30, 2022 Closed 51 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC £2,580,280 June 30, 2021 June 29, 2026 Active 52 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC £6,450,700 June 30, 2021 June 30, 2026 Active 53 Evaluating Novel Wind Energy Designs EPSRC £0 Sept. 23, 2018 March 30, 2022 Active 54 Evaluating Novel Wind Energy Designs EPSRC £0 Sept. 30, 2018 March 31, 2022 Closed 55 Cost-Effective Generator & MVDC Integration for Wind Farms EPSRC £0 Aug. 31, 2020 Aug. 30, 2024 Active 56 Cost-Effective Generator & MVDC Integration for Wind Farms EPSRC £0 Aug. 31, 2020 Aug. 31, 2024 Active 57 ADVANCED SIGNAL PROCESSING METHODS APPLIED TO ACOUSTIC WIND PROFILING FOR USE IN WIND FARM ASSESSMENT EPSRC £652,520 Jan. 5, 2009 July 3, 2012 Closed 58 ADVANCED SIGNAL PROCESSING METHODS APPLIED TO ACOUSTIC WIND PROFILING FOR USE IN WIND FARM ASSESSMENT EPSRC £1,631,300 Jan. 5, 2009 July 4, 2012 Closed 59 Converged Approach towards Resilient Industrial control systems and Cyber Assurance (CAPRICA) EPSRC £788,612 Feb. 1, 2015 Dec. 31, 2017 Closed 60 Converged Approach towards Resilient Industrial control systems and Cyber Assurance (CAPRICA) EPSRC £1,971,530 Feb. 1, 2015 Dec. 31, 2017 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »